User manual 3COM LS-S5600-26F

Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets... DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!

If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Lastmanuals provides you a fast and easy access to the user manual 3COM LS-S5600-26F. We hope that this 3COM LS-S5600-26F user guide will be useful to you.

Lastmanuals help download the user guide 3COM LS-S5600-26F.


Mode d'emploi 3COM LS-S5600-26F
Download
Manual abstract: user guide 3COM LS-S5600-26F

Detailed instructions for use are in the User's Guide.

[. . . ] H3C S5600 Series Ethernet Switches Installation Manual Hangzhou H3C Technologies Co. , Ltd. http://www. h3c. com Manual Version: T2-08045W-20071218-C-1. 04 Copyright © 2006-2007, Hangzhou H3C Technologies Co. , Ltd. and its licensors All Rights Reserved No part of this manual may be reproduced or transmitted in any form or by any means without prior written consent of Hangzhou H3C Technologies Co. , Ltd. Trademarks H3C, , Aolynk, , H3Care, , TOP G, , IRF, NetPilot, Neocean, NeoVTL, SecPro, SecPoint, SecEngine, SecPath, Comware, Secware, Storware, NQA, VVG, V2G, VnG, PSPT, XGbus, N-Bus, TiGem, InnoVision and HUASAN are trademarks of Hangzhou H3C Technologies Co. , Ltd. All other trademarks that may be mentioned in this manual are the property of their respective owners. Notice The information in this document is subject to change without notice. [. . . ] Keep the device far from radio transmitting stations, radar stations, and high-frequency devices. Use electromagnetic shielding when necessary, for example, use shielded interface cables. Route interface cables only indoors to prevent signal ports from getting damaged by overvoltage or overcurrent caused by lightning strikes. 2. 2. 4 Laser Safety The S5600 Series Ethernet Switches are class-1 laser devices. If the optical boards on your switch are operating, do not stare into the optical ports because the laser light emitted by the optical fiber can hurt your retina. Caution: Staring into the laser beam produced by the fiber can hurt your eyes. 2. 3 Installation Tools Flat-blade screwdriver Phillips screwdriver ESD-preventive wrist strap Caution: The installation tools are not provided with the S5600 series. 2-3 Installation Manual H3C S5600 Series Ethernet Switches Chapter 3 Installing the Switch Chapter 3 Installing the Switch Caution: When you ask your sales agent to maintain the switch, you must ensure that the dismantlement-preventive seal on a mounting screw of the switch chassis is intact. If you want to open the chassis, you should contact the agent for permission. Otherwise, you will bear any consequence resulted from your actions without permission. 3. 1 Rack-Mounting the Switch You can install a switch into a 19-inch standard cabinet in one of the following three ways: Use front mounting ears and a tray Use front mounting ears and rear mounting ears Use front mounting ears and guide rails Note: The front mounting ears and rear mounting ears are delivered with the device, no guide rails are delivered with the device. The front mounting ears only secure the switch rather than bear its weight. Guide rails purchased from H3C apply only to standard cabinets 1, 000 mm (39. 4 in) deep. Use other supports to substitute for guide rails in the case of other cabinet depths. 3. 1. 1 Introduction to mounting ear Figure 3-1 shows the appearance of a front mounting ear. 3-1 Installation Manual H3C S5600 Series Ethernet Switches (1) (2) Chapter 3 Installing the Switch L1 L2 (1): Screw hole used to fix the mounting ear to the cabinet (Use one M6 screw) (2): Screw hole used to fix the switch to the mounting ear Figure 3-1 Appearance of a front mounting ear Figure 3-2 shows the appearance of a rear mounting ear. (1): Screw hole used to fix the mounting ear to the cabinet (Use one M6 screw) Figure 3-2 Appearance of a rear mounting ear 3. 1. 2 Introduction to guide rail Figure 3-3 shows the appearance of a guide rail. 3-2 Installation Manual H3C S5600 Series Ethernet Switches Slotted hole 1 Cooling hole Chapter 3 Installing the Switch Slotted hole 2 Slotted hole 1: Used to fix the guide rail to the rear bracket. You can adjust the screw hole position according to the position of the switch. Cooling hole: Used for heat dissipation between switch and cabinet Slotted hole 2: Used to fix the guide rail to the front bracket Figure 3-3 Appearance of a guide rail 3. 1. 3 Use front mounting ears and a tray Follow these steps to install a switch into a 19-inch standard cabinet: 1) 2) 3) Wear an ESD-preventive wrist strap to check the grounding and stability of the cabinet. Fix the delivered tray horizontally in a proper position. Take out the screws which are packed together with the front mounting ears, and fix one end of mounting ears to the switch, as shown in Figure 3-4. Front panel Figure 3-4 Fix front mounting ears 4) Place the switch on the tray horizontally, slide the tray into the cabinet, and fix the other end of mounting ears to the front brackets with crews and captive nuts, as shown in Figure 3-5. 3-3 Installation Manual H3C S5600 Series Ethernet Switches Chapter 3 Installing the Switch Front square-holed bracket Front mounting ear Front panel Front mounting ear Figure 3-5 Fix front mounting ears and a tray 3. 1. 4 Use front and rear mounting ears Follow these steps to install a switch into a 19-inch standard cabinet: 1) 2) 3) Wear an ESD-preventive wrist strap to check the grounding and stability of the cabinet. Take out the screws which are packed together with the front mounting ears, and fix one end of mounting ears to the switch, as shown in Figure 3-4. Take out the load-bearing screws (packed together with the rear mounting ears) and place them in a proper position on the sides of the switch, as shown in Figure 3-6. Three installation locations for screw 1 (select one according to the actual requirement) Screw 1 Screw 1 Front panel Front mounting ear Front mounting ear Figure 3-6 Fix front mounting ears and load-bearing screws 3-4 Installation Manual H3C S5600 Series Ethernet Switches Chapter 3 Installing the Switch Note: There are three positions to mount a load-bearing screw on both sides of a switch. You should select a proper position according to the actual requirements. The rear mounting ears tightly contacted with the load-bearing screws can support the switch. 4) Select a position to install the switch and fix the rear mounting ears to the rear brackets with screws and captive nuts, as shown in Figure 3-7. Rear square-holed rack Figure 3-7 Fix rear mounting ears 5) Hold the bottom of the switch with one hand and the front part of the switch with the other hand, and pull the switch into the cabinet gently, as shown in Figure 3-8. 3-5 Installation Manual H3C S5600 Series Ethernet Switches Chapter 3 Installing the Switch Rear mounting ear Front square-holed bracket Screw 2 Rear square-holed bracket Front mounting ear Rear panel Screw 1: Used to bear the weight Screw 2: Used to fix rear mounting ears to rear brackets Figure 3-8 Fix front and rear mounting ears After the switch is pushed into the cabinet, ensure that the upper edge of rear mounting ears is tightly contacted with the load-bearing screw, as shown in Figure 3-9. Rear panel Rear squareholed bracket Screw 1 Rear mounting ear Screw 1: Load-bearing screw Figure 3-9 Effect diagram of front and rear mounting ear installation (1) 6) Fix the other end of the front mounting ears to the front brackets with screws and captive nuts and ensure that front and rear mounting ears have fixed the switch in the cabinet securely, as shown in Figure 3-10. 3-6 Installation Manual H3C S5600 Series Ethernet Switches Chapter 3 Installing the Switch Screw 1 Rear mounting ear Front panel Front mounting ear Front square-holed bracket Screw 1: Load-bearing screw Figure 3-10 Effect diagram of front and rear mounting ear installation (2) 3. 1. 5 Use front mounting ears and guide rails Follow these steps to install a switch into a 19-inch standard cabinet 1) 2) Wear an ESD-preventive wrist strap to check the grounding and stability of the cabinet. Take out the screwed packed together with the front mounting ears and fix one end of the front mounting ears to the switch, as shown in Figure 3-11. Front panel Figure 3-11 Fix front mounting ears 3) Install guide rails on the brackets on both sides of the cabinet with M5 self-tapping screws, as shown in Figure 3-12. 3-7 Installation Manual H3C S5600 Series Ethernet Switches Chapter 3 Installing the Switch Figure 3-12 Install guide rails 4) Hold the two sides of the switch and slide it gently along the guide rails into the cabinet until it is located in a proper position, as shown in Figure 3-13. Ensure that the bottom side of the guide rails and the switch are in close contact. Front panel Figure 3-13 Install front mounting ears and guide rails 5) Fix the other end of front mounting ears to the front brackets of the cabinet with M6 screws and captive nuts and ensure that the front mounting ears and guide rails have fixed the switch in the cabinet securely, as shown in Figure 3-14. 3-8 Installation Manual H3C S5600 Series Ethernet Switches Chapter 3 Installing the Switch Rear panel Guide rail Figure 3-14 Effect diagram of front mounting ear and guide rail installation Note: Ensure a clearance of 1U (44. 45 mm, namely, 1. 75 inches) between devices for the purpose of heat dissipation. 3. 2 Mounting the Switch on a Tabletop/Workbench When placing the switch on a tabletop or workbench, you simply need to: Make sure that the tabletop or workbench is clean, flat, and sturdy. Allow 10 cm (3. 9 in. ) of clearance around the sides of the chassis. Do not place heavy objects on the switch. 3-9 Installation Manual H3C S5600 Series Ethernet Switches Chapter 3 Installing the Switch 3. 3 Installing/Removing the Power Module Caution: To avoid bodily injury, do not touch any bare conducting wire, screw, and the part which is labeled danger voltage. 3. 3. 1 Installing the Power Module The power module of the S5600 series is swappable. Follow those steps to install the power module: Step 1: Wear an ESD wrist strip, and make sure it is well grounded. [. . . ] You should correctly locate the problem, whether it is caused because the ground wire of the arrester is not well grounded or because the live and zero wires are connected in reverse direction. You may check that in the following way. When the red LED is on, use a multimeter to examine polarity at the power socket of the arrester. If it is same to that of the power socket in the equipment room, it means that arrester is not well grounded. [. . . ]

DISCLAIMER TO DOWNLOAD THE USER GUIDE 3COM LS-S5600-26F

Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets...
In any way can't Lastmanuals be held responsible if the document you are looking for is not available, incomplete, in a different language than yours, or if the model or language do not match the description. Lastmanuals, for instance, does not offer a translation service.

Click on "Download the user manual" at the end of this Contract if you accept its terms, the downloading of the manual 3COM LS-S5600-26F will begin.

Search for a user manual

 

Copyright © 2015 - LastManuals - All Rights Reserved.
Designated trademarks and brands are the property of their respective owners.

flag