User manual ALESIS ADAT-RMB

Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets... DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!

If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Lastmanuals provides you a fast and easy access to the user manual ALESIS ADAT-RMB. We hope that this ALESIS ADAT-RMB user guide will be useful to you.

Lastmanuals help download the user guide ALESIS ADAT-RMB.


Mode d'emploi ALESIS ADAT-RMB
Download
Manual abstract: user guide ALESIS ADAT-RMB

Detailed instructions for use are in the User's Guide.

[. . . ] 15-segment LED bargraph meters kq:p you informed of the leveli for up to gZ tiacis (a ADATs). The meters have two decay ipeeds, fast and slow, which control the time it takes for ihe level indicators to fall back down when audio is no longer present or the tape transport is stopped. Each time a track, s level reachesa new peak, the corresponding LED on the RMB will either remain lit momentarily, or continuouslp or not at all, depending on the mode you selectfrom the front panel. All peak LEDsian be instantly clearedfrom the displai with the press of a single button. [. . . ] Connect one end of the cable labeled "1" to the Meter Bridge Out connector of the first ADAT (tracks 1-), and connect the other end to the Tracks 1-8 connector on the RMB. Push each connector firmly into its socket, then tighten both screws; 'Z' to the Meter Bridge 2. Connect one end of the cable labeled second ADAT (tracks 9-15), and connect Out connector of the the other end to the Tracks 9-15 connector on the RMB; "3" to the Meter Bridge 3. Connect one end of the cable labeled (tracks 17-24), and connect Out connector of the third ADAT the other end to the Tracks 17-24 connector on the RMB; 4. Connect one end of the cable labeled '(' to the Meter Bridge Out connector of the fourth ADAT (tracks 25-32), and connect the other end to the Tracks 2ts32 connector on the RMB. Figure 1 f_____-l-_ir-__5 IIr-rl l ---------------+ Sy c MeterBridge - 4 2. 2 R, AGK-MOUNTINE The two end blocks on either end of the RMB may be removed, if you wish to rack-mount the unit using the rack ears induded with the RMB. The figure below indicates the rack ears' locations and the screws that mount the end blocks. Fizure 2 T g UseONLYthe 1" hex screws t to attach the end blocks , UseONLYthe5/15" phillips to I sc?ews attach the rackear! NOTE: Unlike the BRC, the RMB end blocks will not fit over the rack ears. Depending on your installation neds, one or the other will be attached to the RMB. 2. 3 INOUNJ|/NE JO THE BRC The RMB includes a mounting bracket for attaching to the top of the BRC Master Remote Control. The figures below illustrate how the mounting bracket may be attached to either side of the BRC, and to the bottom of the RMB. Turn the RMB upside down, its front facing you, and remove the three screws in the middle of the RMB. Place the attachment bar on the bottom of the RMB, with its arms extending towards you. Fasten the attachment bar to the RMB using the three soews rernoved in step L and the washers provided. Match up the two holes in the side of the attachment bar with the threaded holes in the side of the RMB. Attach the RMB/bar assemblyto the BRC by inserting one screw and washer on each side, through the front hole. IMPORTANTi MAKE SURE THESE SCREWSARE THE 5/16" SCREWSINCLUDED WITI{ THE RMB PACKAGE, NOT THE LONGER SCREWSINCLUDED WTTFI THE BRC AND INTENDED FOR USE WITH THE ROLL-AROTIND STAND. NOTE; If your BRC is attachedto a stand, skip to step 5. If your BRC is table standing, move on to step 4. 4. Place the back legs against the side of the BRC as shown, lining up the holes in the legs with the hole in the attachment bar and the threaded hole in the BRC. Insert one of the remaining two screws with washers into the second hole and tighten securely. Repeat for the other side of the BRC. GHAPIER 3g BASI9 OPER. A7|ON 3. O POWERIN@-UP Normally, the RMB does not need to be powered up in any order with respectto the ADATs and the BRC for it to work properly. The power switch may be found on the left side of the back of the RMB. When the RMB is powered up, a welcome messageis displayed in the bargraph indicators with the "Alesis" company logo. This messagedisappearsafter a brief moment. At this point, the RMB recalls the most recent mode of operation (the Iast mode before power down). The mode is indicated by the LEDs on the left side of the front panel, above the control buttons. [. . . ] ThisworronVdoesnot covercloims domoqedueio obuse, neolect, olterotion or br personnel, to repoirby unouthorized onJis limited foiiure!oriiingduringnormol oitempted in in usethotoredueto defects moteriol workmonship theproduct. or ANY IMPLIED WARMNTIES, INCLUDING IMPLIED WARRANTIES MERCHANTABILIW OF TO FOR PURPOSE, LIMITED DURATION THELENGTH ARE IN AND FITNESS A PARTICUIAR on LIMITED WARRANTY. Some stotes not ollow limitotions how long on implied do OF THIS moy nol opplyto you. [. . . ]

DISCLAIMER TO DOWNLOAD THE USER GUIDE ALESIS ADAT-RMB

Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets...
In any way can't Lastmanuals be held responsible if the document you are looking for is not available, incomplete, in a different language than yours, or if the model or language do not match the description. Lastmanuals, for instance, does not offer a translation service.

Click on "Download the user manual" at the end of this Contract if you accept its terms, the downloading of the manual ALESIS ADAT-RMB will begin.

Search for a user manual

 

Copyright © 2015 - LastManuals - All Rights Reserved.
Designated trademarks and brands are the property of their respective owners.

flag