User manual FIELD CONTROLS 46400900

Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets... DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!

If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Lastmanuals provides you a fast and easy access to the user manual FIELD CONTROLS 46400900. We hope that this FIELD CONTROLS 46400900 user guide will be useful to you.

Lastmanuals help download the user guide FIELD CONTROLS 46400900.


Mode d'emploi FIELD CONTROLS 46400900
Download
Manual abstract: user guide FIELD CONTROLS 46400900

Detailed instructions for use are in the User's Guide.

[. . . ] Fasten the flexible conduit from the SWG Venter into the conduit connector. Mount the CK-63 Junction box or installer supplied junction box onto the wall or floor joist without straining the flexible conduit. Fasten the CK-63 Junction Box through the four dimpled locations on the base of the box. (See Figure 3) OIL FIRED SECONDARY SAFETY SWITCH Installation of a SECONDARY SAFETY SWITCH is recommended for detecting a blocked flue system and/or inadequate draft. [. . . ] Caution must be taken to ensure that the wiring does not come into contact with any heat source. All line voltage and safety control circuits, between the venter and the appliance, MUST be wired in accordance with the National Electrical Code for Class I wiring or equivalent methods. Route the venter motor and control wiring with an appropriate wiring method. (Diagrams A through F) NOTE: Control is factory set for 120V wiring. For 24V wiring connect the yellow mode wire to the 24V terminal. A resistor has been supplied for 24V power stealing thermostats. (Refer to Figure 6A for installation of resistor) (See Wiring Diagram G for 24V gas furnace applications) NOTE: Circuit board is polarity sensitive. Follow check-out procedures. Figure 6A Mount enclosed resistor between T1 and T2 for 24V power stealing thermostats Figure 6 Close-Up of Interior Board Layout Diagram A ­ Oil Fired System: Page 3 Single Unit Wiring Diagram B ­ Oil Fired System: Simultaneous Burner Wiring Diagram C ­ Oil Fired System: Wiring With Electronic Primary Diagram D ­ Oil Fire System: Simultaneous Burner Wiring With Electronic Primary Page 4 Diagram E ­ Typical Wiring for Oil Fired Warm Air Furnace with a Honeywell ST9103 Control Board Diagram F ­ Multiple Oil Fired Systems Page 5 Diagram G-24V Gas Furnace Application Diagram H-Riello Burner Application Page 6 ADJUSTMENTS PRESSURE SWITCH ADJUSTMENTS With the venter air flow set and the appliance operating at the best operating efficiency, adjust the pressure switch by rotating the adjustment screw clockwise until the burner shuts off, then rotate the adjustment screw counterclockwise until the burner fires. Rotate the adjustment screw an additional 1/4 to 1/2 turn counterclockwise to ensure proper switch setting. (See Figure 7) POST PURGE TIMING ADJUSTMENT To adjust the post purge time, rotate the timer adjustment on the timer clockwise to increase the operation time. To decrease the operation time, rotate the timer adjustment counterclockwise. (See Figure 8) Typical post purge time should be between 3 to 5 minutes. If running burner simultaneous with venter, 1-3 minutes is suggested. Adjust the thermostat to call for heat and observe the power venting system for proper operation sequence (Repeat if necessary). Relay is energized and venter motor starts. Pressure switch closes and burner starts. When the pressure switch closes with a call for heat, the LED light will come on. This indicates that the burner should be in a burn cycle. Thermostat is satisfied, burner stops and venter motor should operate for the set post purge time. The LED should not be on during the post purge. While system is operating, disconnect power to the venter motor. This should open the pressure switch contacts and stop burner operation. [. . . ] Main burner does not fire when thermostat calls for heat with venter operating. (LED should be lit when there is voltage from T1 ­ T2 and the pressure switch is closed. ) b. Check wiring connections between pressure switch and burner. Check pressure switch for continuity across terminals, during venter operation. [. . . ]

DISCLAIMER TO DOWNLOAD THE USER GUIDE FIELD CONTROLS 46400900

Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets...
In any way can't Lastmanuals be held responsible if the document you are looking for is not available, incomplete, in a different language than yours, or if the model or language do not match the description. Lastmanuals, for instance, does not offer a translation service.

Click on "Download the user manual" at the end of this Contract if you accept its terms, the downloading of the manual FIELD CONTROLS 46400900 will begin.

Search for a user manual

 

Copyright © 2015 - LastManuals - All Rights Reserved.
Designated trademarks and brands are the property of their respective owners.

flag