User manual SPYKER 90

Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets... DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!

If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Lastmanuals provides you a fast and easy access to the user manual SPYKER 90. We hope that this SPYKER 90 user guide will be useful to you.

Lastmanuals help download the user guide SPYKER 90.


Mode d'emploi SPYKER 90
Download
Manual abstract: user guide SPYKER 90

Detailed instructions for use are in the User's Guide.

[. . . ] Attach braces to towbar , and towbar to frame using 2 bolts (35) and nuts (34). 5. Insert Clevis Pin (43) into Hitch Plates and fasten with Cotter Pin (42). 4. 6. Attach Hitch plates (44) to Tow Bar assembly using 2 bolts (35) and nuts (34). Attach On/Off Lever Control (46) to Tow Bar assembly using 2 bolts (32) and nuts (33). Proceed to page 9 for instructions on connecting cable to Rate Gate Linkage. 3 4 Walk Behind Frame Assembly Walk Behind Frame Assembly 1. Remove nuts and bolts that attach front of hopper to frame as indicated and then insert Bump Bar (3) into frame assembly. Next, re-insert bolts and tighten nuts. 3. Attach T-Handle assembly to frame with 1 bolt (31) and nut (34). 2. I nsert T-Handle (6) into Ground Prop (5) and fasten with 2 bolts (37) and nuts (34). 4. Attach Braces (8) to frame and THandle assembly. Use 3 bolts (35) and nuts (34) to attach braces to the frame and to the round tube of ground prop. Use bolt (57) and nut (34) to attach braces to the flat support section of ground prop. 5 6 Walk Behind Frame Assembly Rate Dial Adjustment New Linkage Adjustment Procedure 1. [. . . ] A higher setting can be used when a proven dial setting is established. REMEMBER - Published dial settings can be approximate only. The operation of the spreader, the condition of the material (damp or dry or over-pulverized) and weather conditions, are all contributing factors. For these reasons, it's often a good idea to spread the area 2 times at one-half rate - in cross directions (SEE INFORMATION ON ONE-HALF RATE DIAL SETTINGS ON REFERENCE CHART ON THE BACK PAGE. SPREADING AT ONE-HALF RATE DIAL SETTINGS IS HIGHLY RECOMMENDED UNDER DAMP & HUMID CONDITIONS. BECOME FAMILIAR WITH THE OPERATION OF THE SPREADER BEFORE YOU PUT MATERIAL IN THE HOPPER. Practice walking with the spreader, opening and closing the rate gate at the appropriate times. Travel at a constant speed and operate the spreader lever position. Remember: Open the rate gate after the spreader is in motion at operating speed (about 3 mph. , or at a brisk walking pace). Close the rate gate while spreader is still at operational speed. Now You are Ready to Spread · Spread header strips at the ends of the area OPPOSITE the direction of spreading. This will provide a "turn-around" area, an area to realign the spreader for the return spread. wide spread: Make the first spreading pass at one-half the spread width from the edge of the spreading area or in this case approximately 3 feet or one big step. · Additional spreading passes will be at the full spread width or approximately 6 feet apart. · TAKE A SIGHTING AT THE FAR END. Keep your eye on the sighting as you spread. You will not need to wonder where you are or where you have been. Continue until spreading is completed. Header Header 3' 6' 6' · Left over fertilizer can be spread under trees and other high feeding areas without showing "edge of spread" lines. 15 16 Read Before Using NOTE: With the rotary agitator installed, the rate gate closed (not spreading) and with material in the hopper, the spreader will push harder than normal. Shifts the product placement on the spreading spinner. This in turn balances the spread pattern heavier to right or heavier to left as required. (Note the very fine threads on the Equalizer adjustment stem. ) Viewed from the operators position To spread heavier left - move the ramp out. To spread heavier right - move the ramp in. It's the VARIABLES. Each variable has it's own spread pattern characteristics. [. . . ] All products - All spreading conditions. Durability - 70 & 90 Series spreaders will survive use and abuse. Welded steel construction is double braced, finished in baked on epoxy enamel. Generous use of highest quality stainless steel. [. . . ]

DISCLAIMER TO DOWNLOAD THE USER GUIDE SPYKER 90

Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets...
In any way can't Lastmanuals be held responsible if the document you are looking for is not available, incomplete, in a different language than yours, or if the model or language do not match the description. Lastmanuals, for instance, does not offer a translation service.

Click on "Download the user manual" at the end of this Contract if you accept its terms, the downloading of the manual SPYKER 90 will begin.

Search for a user manual

 

Copyright © 2015 - LastManuals - All Rights Reserved.
Designated trademarks and brands are the property of their respective owners.

flag