User manual TJERNLUND 950-1020 MOTOR KIT 8504048 REV 2 1297

Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets... DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!

If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Lastmanuals provides you a fast and easy access to the user manual TJERNLUND 950-1020 MOTOR KIT 8504048 REV 2 1297. We hope that this TJERNLUND 950-1020 MOTOR KIT 8504048 REV 2 1297 user guide will be useful to you.

Lastmanuals help download the user guide TJERNLUND 950-1020 MOTOR KIT 8504048 REV 2 1297.


Mode d'emploi TJERNLUND 950-1020 MOTOR KIT 8504048 REV 2 1297
Download
Manual abstract: user guide TJERNLUND 950-1020 MOTOR KIT 8504048 REV 2 1297

Detailed instructions for use are in the User's Guide.

[. . . ] When wiring is completed, check all components by running system through its entire heating cycle. All vent system leaks must be sealed prior to the installation of the Power Venter. Flue gas temperature must not exceed 575oF at Power Venter Inlet. POWER VENTER MOTOR INSTALLATION Check your Power Venter date code to determine whether it is an "old style" unit or "new style". A. [. . . ] Remove motor from motor mount by removing 4 nuts which secure it. NOTE: USE CARE SO AS NOT TO LOSE SPACERS AND NUTS. Position new motor so that studs extend into motor mount. Motor wires must match up with hole of junction box containing electrical shorty bushing. Feed motor wires through bushing and into junction box. Shaft must be inserted through wheel hub. Firmly fasten motor to motor mount (4 nuts) with a wrench. NOTE: BE SURE TO INCLUDE SPACERS BETWEEN MOTOR AND MOTOR MOUNT, AS WELL AS APPROPRIATE FASTENERS. Tighten wheel set screw on flat part of shaft. Wire Power Venter motor according to appropriate model on the opposite side of this sheet. Be sure grounding wire from motor is utilized. All wiring must be done in accordance with the NEC and applicable local codes. The wiring to the furnace should be protected by overcurrent protection (fuses or circuit brakers) rated 15 amperes or less, as applicable of 14 AWG conductors. CAUTION MUST BE EXERCISED TO ENSURE THAT WIRING DOES NOT COME INTO CONTACT WITH ANY HEAT SOURCE. Before testing installation, on "old style" units check sail switch in Power Venter junction box. Sail must operate freely in slot of fan housing. Operation of switch can be determined by hearing a "click" as switch opens and closes. A "click" must be heard before sail blade touches either end of slot. If "clicks" are not heard, it may be necessary to change bend in blade slightly. Check heater and Power Venter operation. [. . . ] Usually oiling every 3 months during the heating season will be sufficient. NO MORE THAN 3 DROPS of SAE 20 oil should be used. Oil holes or lances are provided at the front and rear faces of motor. NOTE: Magnetek motors do not need to be oiled. [. . . ]

DISCLAIMER TO DOWNLOAD THE USER GUIDE TJERNLUND 950-1020 MOTOR KIT 8504048 REV 2 1297

Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets...
In any way can't Lastmanuals be held responsible if the document you are looking for is not available, incomplete, in a different language than yours, or if the model or language do not match the description. Lastmanuals, for instance, does not offer a translation service.

Click on "Download the user manual" at the end of this Contract if you accept its terms, the downloading of the manual TJERNLUND 950-1020 MOTOR KIT 8504048 REV 2 1297 will begin.

Search for a user manual

 

Copyright © 2015 - LastManuals - All Rights Reserved.
Designated trademarks and brands are the property of their respective owners.

flag