Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets... DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!
If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Lastmanuals provides you a fast and easy access to the user manual APPLIED ENERGY SB2. We hope that this APPLIED ENERGY SB2 user guide will be useful to you.
Lastmanuals help download the user guide APPLIED ENERGY SB2.
Detailed instructions for use are in the User's Guide.
[. . . ] THE
BOILING WATER DISPENSER
INSTALLATION & OPERATING INSTRUCTIONS
IMPORTANT: READ AND SAVE THESE INSTRUCTIONS FOR THE BENEFIT OF THE USER
Thank you for choosing a quality Redring product manufactured by Applied Energy Products Limited, Peterborough, U. K.
Contents
Page
Installation Instructions Important notes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 What the installer will need . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 Where to locate the SB2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 Installing the water supply and steam vent pipes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . [. . . ] q Connect the mains cable from the SB2 to the 13 Amp fused isolating switch. Ensure the cable clamps are firmly secured and the cable ends are tightened into the terminal block. Note: The supply cable must be a minimum of 1. 0mm2 three core multi strand PVC insulated mains cable. The terminal block will not accept cable diameters above 1. 5mm2. Check that the mains supply matches the electrical rating on the product. The rating plate is located on the bottom edge of the unit. IMPORTANT: Connect the supply cable, complying with BS6500, to this appliance in accordance with the following code: GREEN AND YELLOW (EARTH) connect to terminal marked " ". BLUE (NEUTRAL) connect to terminal marked "N" BROWN (LIVE) connect to terminal marked "L" WARNING: THIS APPLIANCE, AND ALL METAL PIPE WORK CONNECTED TO IT, MUST BE EARTHED.
Replacing the front cover
q q q q Support the cover and re-attach the flying lead to the unit (See Fig. Replace the front cover and secure using the top and bottom fixing screws. Carefully replace the knob, ensuring correct alignment of the D shaft. Reconnect the mains supply.
Schematic Wiring Diagram
6
Operating Instructions General Product Description
The SB2 is a wall mounted, self calibrating and self filling boiling water heater. It can be used for making cups of tea or coffee and even soups and hot snacks. A special condenser traps steam and returns droplets to the tank, minimising waste and saving energy. The water temperature is set and automatically maintained by the SB2 and the unit is powered down with the Power button. Water is dispensed by rotating the front cover knob clockwise.
How to operate the SB2
q Make sure the electricity and water is turned on. 6 q Use the POWER button to switch the SB2 on and to power down. (The SB2 should be switched off at the mains if the water is not required e. g. POWER light When the SB2 is on the POWER light will come on. FULL light The FULL light comes on when the tank is full of water. (The SB2 fills up automatically and this can take up to 10 minutes if the tank is completely empty). TEMPERATURE READY light The TEMPERATURE READY light comes on when the water is hot enough to use. (This can happen even when the tank is not completely full of water).
7
Please Note: q The SB2 can take several minutes to reach the required temperature, depending on usage and tank capacity. [. . . ] Wait for the FULL & TEMPERATURE READY lights to come on again. When the SB2 is first switched on it can take up to 18 minutes to reach the Boil setting. (See Table 3 on page 10 for approximate heat up times). Check that a pipe has been fitted to the steam vent. [. . . ]
DISCLAIMER TO DOWNLOAD THE USER GUIDE APPLIED ENERGY SB2
Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets... In any way can't Lastmanuals be held responsible if the document you are looking for is not available, incomplete, in a different language than yours, or if the model or language do not match the description. Lastmanuals, for instance, does not offer a translation service.
Click on "Download the user manual" at the end of this Contract if you accept its terms, the downloading of the manual APPLIED ENERGY SB2 will begin.