Detailed instructions for use are in the User's Guide.
[. . . ] After filling the part cavity at 100% with polymer, the gas is injected under pressure and the overflow cavity is open to collect the superfluous plastic. The gas ensures the holding phase pressure during cooling and is purged immediately before opening the mould.
Gas
3
Gas BENEfITS Of GIT
The use of gas assisted injection technology allows production of technical parts with the appearance of superior quality. The manufacturing process is also more efficient, improving productivity and thus significantly increasing profitability. A better quality of injected part: - High strength and rigidity - Dimensional stability, no warpage - Elimination of sink marks - No assembly, single parts Simplification of tools Freedom in design Lower clamping force (in partial) Reduced cycle time Material saving Realization of hollow (pipe)
GIT-sysTEms
BAUER EXPERIENCE
Our outstanding expertise in purifying gases coupled with software-based control technology developed by our BAUER specialists guarantee you outstanding product quality which will improve profitability. [. . . ] 1) l/min m3/h
5 7, 5 10 13
Number of stages
Speed r. p. m
motor power kW
3 4 4 5, 5
Power Net weight consumption approx. kW
2, 2 3, 1 3, 7 4, 7
kg
255 255 260 260
350 bar / 5000 psig, High pressure compressor for nitrogen MV-GI 100-3-3 MV-GI 100-4-3 MV-GI 120-4-3 MV-GI 120-5, 5-3 85 125 170 215 3 3 3 3 900 1270 1200 1470
model
f. A. d. 1) l/min m3/h
Number Intake Operating Speed motor Power Net weight of stages pressure pressure power consumption approx. (bar g)
5-11
bar
90-350
r. p. m
1230
kW
5, 5
kW
3, 3-5, 1
kg
275
350 bar / 5000 psig, High pressure booster for nitrogen MV-GIB 12. 2-5, 5-3 200-4752) 12-28, 5 2
1) measured acc. to IsO 1217.
2) maximum capacity according to the combination of intake and final pressure.
GIT-sysTEms
THE VERTICUS 5 RANGE
The high pressure compression under control. Multi stage piston compressor/booster units, lubricated, with a final separator and filtration type P61 / P81 for securing a compressed gas with high purity. Complete system mounted on skid with up to two HP cylinders. Available as soundproof version 72-76 dB(A). Directly connectable to the source of nitrogen. The B-CONTROL controller allows to monitor the operation of the compressor and to indicate the alarms such as temperatures, operating pressures, oil pressure and maintenance, etc. 500 bar discharge pressure version optional.
model f. A. d1) l/min
GI - Range, 90 - 350 bar / 1300 - 5000 psig GI 100-3-5 GI 100-4-5 GI 120-5, 5-5 GI 15. 1-7, 5-5 GI 15. 1-11-5 GI 150-11-5 GI 180-15-5 GI 15. 11-7, 5-5 GI 15. 11-11-5 GI 18. 1-15-5 85 125 215 340 420 500 610 310 420 550 5, 1 7, 5 13 20, 4 25, 2 30 36, 6 18, 6 25, 2 33 3 3 3 4 4 4 4 4 4 5 900 1270 1470 1050 1320 1230 1320 960 1320 1320 3 4 5, 5 7, 5 11 11 15 7, 5 11 15 2, 2 3, 3 4, 7 6, 9 9, 6 10, 2 12 7 10, 4 12, 4 335 340 355 440 450 460 470 470 470 470
Number Speed of stages m3/h r. p. m.
motor kW
Power Net weight consumption approx. kW kg
GI - Range, 350 - 500 bar / 5000 - 7200 psig
model
Intake pressure bar(g)
f. A. d. 1) l/min
200 - 4752) 510 - 750
2) 2)
Number of stages m3/h
12 - 28, 5 30, 6 - 45 27 - 48 2 2 3
Speed r. p. m.
1230 1140 1320
Power consumption kW
3, 3 - 5, 3 6, 6 - 8, 2 7, 6 - 12, 2
BOOSTER GIB, 90-350 bar / 1300-5000 psig GIB 12. 2-5, 5-5 GIB 15. 3-11-5 GIB 15. 4-15-5 5 - 11 7 - 10 2-4
450 - 800
1) measured acc. to IsO 1217.
2) maximum capacity according to the combination of intake and final pressure.
BAuEr KOMPrESSOrEN
GIT-sysTEms
The fCC 5 - the latest first-class controller
THE dISTRIBUTION PANEL
BAUER distribution panels have been in operation worldwide for the past 10 years. These mature and well proven control systems guarantee the user maximum reliability, with minimum downtime.
INTERfACE ANd CONTROLLER
Seven levels of time pressure with ramps transition in time. Cleaning cycle with clogged injector detection (patented). Graphic displays for pressure versus time. Screen quality on the relevant current values and last 100 cycles. Alarms (message, sound 97 dB, cycle stopped) with history. Programs and data quality storage on internal memory Compact Flash, USB key or via Ethernet. Screen service with maintenance history and display technician diagnostic. Support and diagnosis via the Internet in real time. Usage with 2 moulding machines possible (option).
CONNECTIONS
Start signal: screw position or the start of plastic injection. [. . . ] Five time and pressure stages with ramp transitions in time. Quality and alarms screens are available. Remote control for Start/Stop, Injector test, Reset IP address functions. Green and red lights inform on panel status (ready, cycle in progress, alarms, etc. ). [. . . ]