Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets... DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!
If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Lastmanuals provides you a fast and easy access to the user manual BESTWAY LAY-Z PREMIUM. We hope that this BESTWAY LAY-Z PREMIUM user guide will be useful to you.
Lastmanuals help download the user guide BESTWAY LAY-Z PREMIUM.
Detailed instructions for use are in the User's Guide.
[. . . ] When installing and using this electrical equipment, basic safety precaution should always be followed, including the following: Insert the plug only into a properly grounded socket. WARNING: The spa must be supplied by an isolating transformer or supplied through a residual current device (RCD) having a rated residual operating current not exceeding 30mA. WARNING: RCD/PRCD must be tested before each use. WARNING: If the supply cord is damaged, it must be replaced by the manufacturer, its service agent or similarly qualified persons in order to avoid a hazard. [. . . ] Take a minute to become familiar with the accessories. Install the side beams by inserting one of the beams into the pole sleeve on the side of the spa. Be sure to line up the holes on the sleeve with the holes on the beam. Repeat this step on the opposite side of the spa. Connect the inflation hose to adapter A on the pump. As previously outlined, test the pump's RCD/PRCD plug and press the Lay-Z-Massage button to activate the pump. Screw the SID-Valve onto the air intake valve. Open the top cover of the SID-Valve, insert the inflation hose and inflate. Once inflation is finished, fasten the top cover of the SID-Valve. To deflate simply unscrew the SID-Valve counter clockwise from the air intake valve. Using the inflation hose, inflate the spa chambers according to the printed number 1, 2, 3, 4, 5. Insert the U-Supports through the pool support sleeve at the bottom of the spa, insert the two ends of the U-Supports into the exposed holes on the beam and ensure the spring-loaded pins snap into position. Repeat this step on the opposite side of the spa. Locate the markings A and B on the bottom of the side tables and insert the corresponding clips by pressing down on the tabs and slide the clips into position. Align the table supports with Clips B and insert the locking pin. Repeat this step for the opposite table. Rotate the locking pin 180° to lock them into position. Repeat this step for the opposite table. Align the holes on the table supports to the holes on the U-Supports and insert the locking pin. Rotate the two locking pins 180° to lock them into position. Repeat this step for the opposite table. Connect the pump to the spa by lining up the matching letters (A to A, B to B and C to C), and using the adapters to connect the pump to the spa. [. . . ] This is essential to extend the life of the spa. We recommend the use of a wet/dry vacuum to blow out or suck up water from the spa pipes and pump lines. It is recommended you store the spa in its original package in a warm dry place. nOTE: Plastic becomes brittle and susceptible to breaking when exposed to subzero temperatures. [. . . ]
DISCLAIMER TO DOWNLOAD THE USER GUIDE BESTWAY LAY-Z PREMIUM
Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets... In any way can't Lastmanuals be held responsible if the document you are looking for is not available, incomplete, in a different language than yours, or if the model or language do not match the description. Lastmanuals, for instance, does not offer a translation service.
Click on "Download the user manual" at the end of this Contract if you accept its terms, the downloading of the manual BESTWAY LAY-Z PREMIUM will begin.