Manual abstract: user guide CANON VB-S31DSPECIFICATION
Detailed instructions for use are in the User's Guide.
[. . . ] Canon model VB-S31D A&E Specifications
SECTION 28 23 00 VIDEO SURVEILLANCE SYSTEM DISCLAIMER FOR VIDEO SURVEILLANCE SPECIFICATIONS The following is a recommended form of disclaimer with respect to the illustrative specifications for the Video System Surveillance System using the Canon NVS camera systems. The disclaimer presumes that the technical details in each of the illustrations, as set forth under Section 2. 02 System Specifications, have been reviewed and confirmed by Canon as meeting the technical specifications for each of the relative product models as of the date hereof. Further, it is recommended that the examples to be delivered include an embedded “watermark” or other reference on each page indicating that they are “For Illustration Only”. DISCLAIMER: These “Section 28 23 00 Video Surveillance System” specifications (the “Form Specifications”) are general in nature and solely for illustration. [. . . ] Provide shop drawings to verify location of all equipment, conduit runs, power connections, etc. Submit shop drawings to OWNER Project Manager. Coordinate with OWNER to provide space for the placement of all monitoring, control and recording equipment. Prepare and pre-test all equipment to the greatest extent possible. 1. 10 SCHEDULING The Contractor, within five (5) days after being awarded the contract, shall prepare and submit for OWNER’s information, an estimated progress schedule for the Work. The progress schedule shall be related to the entire project, and shall indicate start and completion dates. Contractor warrants that all Work furnished (material and labor) under this Contract will be of good quality, free from faults and defects, and in conformance with the Project Drawings and Specifications. Contractor shall provide parts and labor guarantee on all Work. Unless otherwise specified herein, Contractor’s guarantee shall be for a period of one (1) year from date of Acceptance, except where any specific guarantees from a supplier or equipment manufacturer extends for a longer time. Contractor’s guarantee shall cover all costs associated with troubleshooting, repair, and replacement of defective Work, including costs of labor, transportation, lodging, materials, and equipment. Guarantee shall not cover any damage to material or equipment caused by accident, misuse, unauthorized modification or repair by OWNER, or acts of god.
28 23 00 - 8 Video Surveillance System
B.
C.
D.
OWNER / November 22, 2013
Canon model VB-S31D A&E Specifications
E.
Contractor shall promptly respond to OWNER’s requests for service during the guarantee period. Contractor shall provide repair service as soon as reasonably possible upon request from OWNER, but in no case shall service response exceed 8 hours from time of request.
1. 12 SYSTEM STARTUP Power shall only be applied to the system after re-checking for proper grounding of the system and measuring all loops for lack of shorts, grounds, and open circuits. Contractor shall closely schedule and coordinate his activities with designated OWNER representatives. Contractor shall provide OWNER’s Project Manager with a work plan on a weekly basis. Such work plan will describe locations of intended activities, types of activities, and potential conflicts to facility operations. Contractor shall perform Work in accordance with manufacturer’s instructions. Do no omit any preparatory step or installation procedure unless specifically modified or exempted by Contract Documents. Contractor shall maintain one set of complete instructions at the job site during installation and until completion.
B.
1. 14 COMMISSIONING A. After all Work is completed, and prior to requesting the Acceptance Testing & Inspection, Contractor shall conduct a final inspection, and pre-test all equipment and system features. Contractor shall correct any deficiencies discovered as the result of the inspection and pre-test. Contractor shall submit a request for the Acceptance Test & Inspection in writing to the OWNER Project Manager, no less than fourteen days prior to the requested test date. The request for Acceptance test shall be accompanied by a certification from Contractor that all Work is complete and has been pre-tested, and that all corrections have been made. [. . . ] No exposed conduit, raceway, or junction box shall be installed within any office area. Do not support conduit from mechanical, plumbing, or fire sprinkler systems. Drill or core drill all holes in walls, ceilings, or floors where required for new conduits. Do not cause damage to any structural steel or other structural support member by drilling or cutting. [. . . ]
DISCLAIMER TO DOWNLOAD THE USER GUIDE CANON VB-S31D
Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets... In any way can't Lastmanuals be held responsible if the document you are looking for is not available, incomplete, in a different language than yours, or if the model or language do not match the description. Lastmanuals, for instance, does not offer a translation service.
Click on "Download the user manual" at the end of this Contract if you accept its terms, the downloading of the manual CANON VB-S31D will begin.