[. . . ] Sunny Boy SWR 1800U
Installation and Operator's Manual
Issue 1. 0
Grid Tied String Inverter for Photovoltaic Systems
SB1800U-11:NE0402
Sunny Boy 1800U
Installation and Operator's Manual
Alteration Review
Document Number SB1800U -11:NE0402 Issue and Alteration Review 1) 1. 0 A Comments Author
First issue
Homburg
1
)
A: Changes due to faulty documents or improvement of the documentation B: Changes maintaining full or upward compatibility C: Changes limiting or excluding compatibility
Name Approved Bremicker
Date
Signature
SB2500U-11:NE
-2-
SMA Regelsysteme GmbH
Sunny Boy 1800U
Installation and Operator's Manual
IMPORTANT SAFETY INSTRUCTIONS
This manual contains important instructions that shall be followed during installation and maintenance of the Sunny Boy. To reduce the risk of electrical shock, and to ensure the safe installation and operation of the Sunny Boy, the following safety symbols have been placed throughout this technical description to indicate dangerous conditions and important safety instructions. WARNING: This indicates a fact or feature very important for the safety of the user and / or which can cause a serious hardware defect if not applied appropriately. Use extreme caution when performing this task.
NOTE: This indicates a feature that is important either for optimal and comfortable usage or optimal operation of the system. [. . . ] The Sunny Boy requires a maximum 3 W internal consumption which it takes from the PV-panel. If you measure the voltage of the PV-modules you must keep in mind the inverter's internal consumption that will have an effect on your measurement with lower solar radiation. The open circuit voltage of the PV-panel will therefore not be displayed. The internal consumption is negligible for the voltage measurement with higher solar radiation. The operating state of the Sunny Boy will be indicated with three LEDs integrated into the lid. The meaning of the LEDs will be explained in chapter 4, "Operation and Failure Indication LEDs".
SB2500U-11:NE
- 23 -
SMA Regelsysteme GmbH
Sunny Boy 1800U
Installation and Operator's Manual
4 Operation and Failure Indication LEDs
The inverter normally operates automatically, without user interaction and without any maintenance. The inverter automatically turns itself off when a grid feeding is not possible (e. g. The Sunny Boy automatically starts its grid feeding the next day once the solar radiation is high enough. The inverter goes to standby mode if the radiation and the resulting electric input energy is too low and is therefore always ready for operation. Each time the Sunny Boy starts up it runs a number of self test and safety procedures which the user does not notice. The user can obtain the inverter's operating status from the 3 integrated LEDs on the lid (see Table 4. 1: Operation indication overview). The green LED "Operation" describes the current operation of the Sunny Boy, see chapter 4. 1 "Operation Indicator". The red LED warns the user that the GFDI-fuse is defective. A description of this situation and what has to be done in that case is given in chapter 4. 2. The yellow LED "Failure" indicates an internal or external failure that keeps the inverter from feeding the grid. The specific causes for this and how to avoid them are described in chapter 4. 3 "Failure Indication". The red and yellow LED combined indicate that the internal Ground Fault Detector and Interupter (GFDI) has detected a ground fault in the PV panel. A description of this situation and what has to be done in that case is given in chapter 4. 2.
SB2500U-11:NE
- 24 -
SMA Regelsysteme GmbH
Sunny Boy 1800U
Installation and Operator's Manual
Fig. 4. 1: Front view of Sunny Boy 1800U
Description of the symbols used in the following section:
LED off LED on once per second LED on three times per second LED on with short interruptions (75% on, 25% off) LED on Not important
SB2500U-11:NE
- 25 -
SMA Regelsysteme GmbH
Sunny Boy 1800U
Installation and Operator's Manual
LED-indicator green: red: yellow: green: red: yellow:
Operating Condition standby (night)
Description input voltage < 120 V
initialization
input voltage: 94 V. . . 147 V
green: red: yellow:
stop
changing operating condition or manually initiated condition
green: red: yellow:
waiting, checking grid
starting conditions are being checked
green: red: yellow:
feeding grid MPP or constant voltage mode
normal operation
green: red: yellow:
derating mode
Reduction of power fed to the grid due to increased temperature of the heat sink
green: red: yellow:
isolation failure
ground fault of the PV-panels see chapter 4. 2
green: red: yellow:
failure
GFDI fuse is defective see chapter 4. 2
green: red: yellow:
failure
internal or external failure, exact description depending on blink code see chapter 4. 3
green: red: yellow:
Consistent Failure
A failure of the utility has occurred
Table 4. 1: Operation indication overview
SB2500U-11:NE
- 26 -
SMA Regelsysteme GmbH
Sunny Boy 1800U
Installation and Operator's Manual
4. 1 Operation Indicator
Standby (night)
all LEDs are off
The
Sunny
Boy
is
in
"Standby"
mode.
The
input
voltage
is
too
low
(VPV < 94 V) for supplying the Sunny Boy control system with enough power.
Initialization
all LEDs are on
The Sunny Boy control system is initializing. The string voltage to the inverter is between approx. The supply is sufficient for the system control and not quite sufficient for feeding to the grid. NOTE: In some seldom cases (bad weather, low solar radiation) the LEDs can go on all at once and off again. [. . . ] Based on this temperature and knowing the type of PV modules used you can then determine the maximum open circuit voltage of the PV panel. You can enter these data into our EXCEL® tool "GenAu" and check whether the maximum admissible input voltage of the Sunny Boy is not exceeded under any possible operating conditions. You will find this tool in the Internet for download at: http://www. sma. de/ftp/energietechnik/sunnyboy/GenAu/GenAu. exe WARNING: The MPP-voltage of the connected PV-modules may not fall below the specified range at 158°F (+70°C) (VMPP +158 °F > min. NOTE: The Sunny Boy can tolerate a current higher than the specified current as long as the voltage is within the specified range.
SB2500U-11:NE
- 48 -
SMA Regelsysteme GmbH
Sunny Boy 1800U
Installation and Operator's Manual
7. 1. 1 Minimum MPP-voltage of the PV panel
Often a fixed lower MPP voltage limit of the inverter is not useful when the cells of the PV panel have very high temperatures. [. . . ]
DISCLAIMER TO DOWNLOAD THE USER GUIDE CONTAX SWR 1800U
Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets... In any way can't Lastmanuals be held responsible if the document you are looking for is not available, incomplete, in a different language than yours, or if the model or language do not match the description. Lastmanuals, for instance, does not offer a translation service.
Click on "Download the user manual" at the end of this Contract if you accept its terms, the downloading of the manual CONTAX SWR 1800U will begin.