Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets... DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!
If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Lastmanuals provides you a fast and easy access to the user manual DESA MASTER GREEN 115. We hope that this DESA MASTER GREEN 115 user guide will be useful to you.
Lastmanuals help download the user guide DESA MASTER GREEN 115.
Detailed instructions for use are in the User's Guide.
[. . . ] GREEN heaters can operate with burners that are fuelled by heating oil, methane (G20) or L. There are three safety devices which are activated in case of serious malfunction. The Burner Control Device, which is mounted on the burner and has a restart button, automatically stops the burner if the flame goes out. The Overhrat Thermostat, L2, of the manuel restart type, is activated if the temperature of the combustion chamber rises above the set maximum limit; the warning light (9) lights up and the heater stops working. [. . . ] When the heateris first turned on you must check that the fan does not use more current than the maximum permitted limit. CONNECTION TO HOT AIR DUCTS The space heater provides heat by releasing and dispersing hot air. An air head is supplied with each unit and it can be connected to new air ducts if the user wishes to satisfy specific needs. In this case and in particular if the diameter and length of the ducts have been changed or if the number of bends has been modified, air output may vary. Consequently it is very important to check and regulate air output when any modification is made to air heads or air ducts. in all circumstances you must ensure that: · The fan motor does not absorb more current than the maximum permitted limit; · the volume of air flow corresponds to the recommended level. If the heater is equipped with centrifugal fan and if the volume of hot air differs from preset values proceed as follows (Fig. 1): 1) Remove the aspiration grill which is on fan motor side of the unit; 2) Remove the screws (2) from the motor slide. 3) Remove the belt (1); 4) Loosen the bolts (3); 5) Turn the pulley clockwise and anti-clockwise in order to increase or reduce the volume of air; 6) Tighten the bolts (3); 7) Put back the aspirations grill; 8) Repeat operations (1) -(7) until the correct volume of air flowhas been achieved. The burner can use both methane gas and L. The gas used to predispose the heater at factory has been declared on data plates applied on the box and on the heater it self (methane, G20, or L. Repeat regulation of combustion while composition of combustion waste products are checked. Correct data plate on the heater writing which type of gas must be used. REGULATION OF COMBUSTION - I°OPERATION After having checked the hermetic seal of line and of combustion waste products line, heater may be operated for the first time. To perform regulation of combustion correctly, combustion waste products must be analyzed using appropriate instruments: values recommended by actual standards must be reached. Adjustments to be carried out are described in the Burner Instruction Manual; final values of CO2 shall be correspondant to excess air factor of 1, 2 (12, 5% for gas-oil, 9, 7% for G20, 9, 6% for G25, 11, 7% for G30 and 11, 7% for G31) while CO level shall be less than 75 ppm. The unit must be connected to the chimney flue in accordance with current legal regulations and in line with the following guidelines: · The tube which carries the smoke should cover as short a distance as possible and should slant upwards; · There should be no sharp bends in the tubes and the diameter of the tubes must never be reduced; · Every heater must have its own chimney; · Flue draft must at least correspond to the minimum compulsory level in the Technical Specifications. ANALYSIS OF COMBUSTION WASTE PRODUCTS The probes which check the composition of combustion waste products and smoke temperature must be positioned as indicated in Fig. When these tests have been completed the hole which was drilled for the probe must be sealed with a material which is resistant to high temperatures and which ensures that the tube remains airtight. If the unit is operated manually turn the control knob to . The burner starts up, the combustion chamber heats up and then the fan starts; · If the unit operates automatically set the room thermostat at the desired level and turn the control knob (2) to : the heater will now start and stop automatically. If the heater doesn't start after you have completed the above operations consult the Troubleshooting section of this manual. [. . . ] warning: Never try to lift the heater manually. Doing so could result in physical injury. Turn it off as indicated above · disconnect electricity by pulling out the plug · Wait until the heater cools down The heater has four hooking points at the four top corners. The heater should be moved or lifted by means of ropes or chains connected to the hooking points. [. . . ]
DISCLAIMER TO DOWNLOAD THE USER GUIDE DESA MASTER GREEN 115
Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets... In any way can't Lastmanuals be held responsible if the document you are looking for is not available, incomplete, in a different language than yours, or if the model or language do not match the description. Lastmanuals, for instance, does not offer a translation service.
Click on "Download the user manual" at the end of this Contract if you accept its terms, the downloading of the manual DESA MASTER GREEN 115 will begin.