User manual EUTECH INSTRUMENTS LEAD EPOXY

Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets... DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!

If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Lastmanuals provides you a fast and easy access to the user manual EUTECH INSTRUMENTS LEAD EPOXY. We hope that this EUTECH INSTRUMENTS LEAD EPOXY user guide will be useful to you.

Lastmanuals help download the user guide EUTECH INSTRUMENTS LEAD EPOXY.


Mode d'emploi EUTECH INSTRUMENTS LEAD EPOXY
Download
Manual abstract: user guide EUTECH INSTRUMENTS LEAD EPOXY

Detailed instructions for use are in the User's Guide.

[. . . ] EUTECH INSTRUMENTS PTE LTD. INSTRUCTION MANUAL LEAD ION ELECTRODE TABLE OF CONTENTS GENERAL INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 Required Equipment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 Required Solutions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 GENERAL PREPARATION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 Electrode Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 Electrode Slope Check (with pH/mV meter) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 Electrode Slope Check (with ion meter) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 MEASUREMENT. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 Measuring Hints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 Sample Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 Units of Measurement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 MEASUREMENT PROCEDURE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . [. . . ] After rinsing the electrodes, blot dry, and lower the electrode tips into the solution. After stabilization, read the concentration directly from the meter display. The calibration should be checked every two hours. Assuming no change in ambient temperature, immerse the electrode tips in the more dilute standard. After the reading has stabilized, compare it to the original reading recorded in Step 4 above. A reading differing by more than 0. 5 units or a change in ambient temperature will necessitate repetition of Steps 2-8 (2-9) above. The meter should be re-calibrated daily. 3. 8. 9. 10. 11. 7 Low Level Lead Determination (using a pH/mV meter) This procedure is recommended for solutions with lead concentrations of less than 1. 0X10-6M. If the solution is high in ionic strength, but low in lead ion concentration, use the same procedure, but prepare a calibration solution with a composition similar to the sample. Using 20 ml of standard ISA, dilute to 100 ml with distilled water. This low level ISA (1. 0M NaClO4) is added at the rate of 1 ml low level ISA to each 100 ml of solution. The background ionic strength will be 1. 0X10-2M. Dilute 1ml of 0. 1M standard to one liter to prepare a 1. 0X10-4M solution for measurements in moles per liter. Prepare a 10 ppm standard solution by diluting 1 ml of the 1, 000 ppm standard to 100 ml for measurements in ppm. Standards should be prepared fresh daily. Plastic lab-ware is recommended to avoid absorption of lead on the beaker walls. Add 50 ml of distilled water, 50 ml of methanol-formaldehyde solution, and 1 ml of low level ISA to a 150 ml plastic beaker. Place the beaker on the magnetic stirrer and begin stirring at a constant rate. Place the electrode tips in the solution. Assure that the meter is in the mV mode. Add increments of the 1. 0X10-4M or 10 ppm standard as given in Table 2 below. After the reading has stabilized, record the mV reading. [. . . ] Electrode charge will be carried unequally across the solution boundary resulting in a potential difference between the two solutions, since ions diffuse at different rates. When making measurements, it is important to remember that this potential be the same when the reference is in the standardizing solution as well as in the sample solution or the change in liquid junction potential will appear as an error in the measured electrode potential. The composition of the liquid junction filling solution in the reference electrode is most important. The speed with which the positive and negative ions in the filling solution diffuse into the sample should be equitransferent. [. . . ]

DISCLAIMER TO DOWNLOAD THE USER GUIDE EUTECH INSTRUMENTS LEAD EPOXY

Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets...
In any way can't Lastmanuals be held responsible if the document you are looking for is not available, incomplete, in a different language than yours, or if the model or language do not match the description. Lastmanuals, for instance, does not offer a translation service.

Click on "Download the user manual" at the end of this Contract if you accept its terms, the downloading of the manual EUTECH INSTRUMENTS LEAD EPOXY will begin.

Search for a user manual

 

Copyright © 2015 - LastManuals - All Rights Reserved.
Designated trademarks and brands are the property of their respective owners.

flag