User manual GAF TOPCOAT STANDARDS PART 1 FOR METAL SPECIFICATIONS REV 06-2001
Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets... DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!
If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Lastmanuals provides you a fast and easy access to the user manual GAF TOPCOAT STANDARDS. We hope that this GAF TOPCOAT STANDARDS user guide will be useful to you.
Lastmanuals help download the user guide GAF TOPCOAT STANDARDS.
You may also download the following manuals related to this product:
GAF TOPCOAT STANDARDS PART 2 FOR METAL SPECIFICATIONS REV 06-2001 (84 ko)
Manual abstract: user guide GAF TOPCOAT STANDARDSPART 1 FOR METAL SPECIFICATIONS REV 06-2001
Detailed instructions for use are in the User's Guide.
[. . . ] TOPCOAT STANDARD SPECIFICATIONS FOR METAL
PART 1 - GENERAL
1. 05
REGULATORY REQUIREMENTS
1. 01
RELATED SECTIONS / DOCUMENTS
Topcoat Detail Drawings, site specific drawings and General Provisions of the contract, including General, Supplementary and Special Conditions found in Division7 Specification Sections, apply to the work addressed in this section. FM Listing: Provide Topcoat Roofing System and component materials which have been evaluated by Factory Mutual System for flame-spread and are listed in "Factory Mutual Approval Guide" for Class I construction over existing metal roofing (Flame spread must be in accordance with ASTM #E-108). Provide roof covering materials, bearing FM approval marking on package or container, which indicates that material has been subjected to FM's examination, test procedures, follow-up inspection services and approval. UL Listing: Provide Topcoat Roofing System and component materials which have been evaluated by Underwriters Laboratories for flame-spread, and are listed in "Underwriters Laboratory Roofing Materials and Systems Directory" for Class A construction over existing metal or other non-combustible roofing (Flame-spread must pass ASTM #E-108 with unlimited slope). [. . . ] It is ideal for priming aluminum coated metal roofs, which are beginning to rust through the coating. Heavy, flaking rust and scale must be removed by scraping, wirebrushing or grit blasting, followed by power washing with water. Surface Seal SB Primer can be used to brush-treat small-scattered areas of rust, or it can be sprayed over areas of widespread rust. Application Rate: 1 gallon / 100 sf Application Method: Brush or airless sprayer Application Temperature (air, surface): 35° - 120°F Drying Time (75°F, 50% RH): Approximately 2 hours Total Solids (by weight): 60% ± 1% Specific Gravity / Weight per Gallon: 1. 21 / 10. 1 lbs Viscosity (75°F): 8, 000 ± 1, 000 cps Clean-up: Mineral Spirits
O.
Fasteners: EverTiteTM self-drilling stitching screws; hex-head, zinc-coated.
P. Airless Sprayer and Accessories: As recommended by Topcoat Technical Department for application of sprayable Topcoat products
8
Rev June 2001 TOPCS502
TOPCOAT STANDARD SPECIFICATIONS FOR METAL
PART 3 - EXECUTION
3. 01
PREPARATION OF SUBSTRATE
flanges must be stitch-screwed to the curb unit and metal roof panel while the FlexSeal is still wet using EverTiteTM fasteners. This procedure shall apply to installation of all new crickets and curbs. Treatment of Ponding Water Areas: Installer shall make every effort to mechanically eliminate all ponding water areas on the roof prior to application of Topcoat products ("ponding water" is defined as water which does not properly drain and remains for more than 48 hours after precipitation stops). Ponding water areas which cannot be eliminated shall be treated with FlexSeal LV prior to application of other Topcoat products. Repair of Dented / Damaged Panels: Installer shall repair dented and/or damaged metal roof panels. Dents shall be mechanically removed to the maximum extent possible. If ribs are broken, Installer shall cover the broken rib area with a sheet metal cap. Sheet metal rib caps must be "sealed" to the roof by applying Topcoat Flashing Grade over the entire broken rib area to be capped prior to attaching the cap with EverTiteTM fasteners. Then, Topcoat Flashing Grade shall be used to seal all the newly created rib cap seams and fasteners. Should roof panels be severely damaged, Installer shall remove and replace damaged areas prior to application of Topcoat products.
A. Examine Substrates to receive new roofing. Do not proceed with installation of the Topcoat Roofing System until unsatisfactory conditions have been corrected in a manner acceptable to the manufacturer (GAFMC Topcoat. ). Preparation of the Roof Substrate is the responsibility of the Installer. Installer shall address and correct all of the following: · · · · · · · · · · Treatment of excessive gaps Installation of sheet metal crickets Treatment of ponding water areas Repair of dented / damaged panels Re-tightening and replacement of fasteners Thorough cleaning / Removal of existing paints and coatings Treatment of residual asphalt Treatment of rust areas Priming of pre-finished metal panels Miscellaneous items
C. Treatment of Excessive Gaps: All large or excessive gaps existing between roof panels must be closed or made flush with EverTiteTM self-drilling fasteners. Closed-celled foam strips or polyurethane foam may be used to pre-fill voids larger than 1/4 inch before applying Topcoat Flashing Grade. Foam shall be shaped with a utility knife or other method to create a cant strip which facilitates both Topcoat adhesion and water drainage, as well as, prevents shearing of Topester Fabric on metal edges. Installation of Sheet Metal Crickets: Sheet metal crickets must be installed according to manufacturer's specifications (minimum 26 gauge metal - heavier gauge required for larger crickets) on the high side of all curb units. [. . . ] Both the top and bottom of neoprene pipe boots shall be flashed using Topcoat Flashing Grade and Topester Fabric as described above. Skylights: Curb skylights shall be treated in the same fashion as Curb Flashings. The entire perimeter of 12
3. 03
OTHER ITEMS
Rev June 2001 TOPCS502
TOPCOAT STANDARD SPECIFICATIONS FOR METAL
A. Installer shall take photographs of representative roof areas, including detail work, at the following intervals (minimum): · Before work commences · After roof has been thoroughly cleaned and prepared for application of Topcoat Roofing System products · After all flashing and detail work has been performed · After spray application of Topcoat Roofing Membrane B. [. . . ]
DISCLAIMER TO DOWNLOAD THE USER GUIDE GAF TOPCOAT STANDARDS
Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets... In any way can't Lastmanuals be held responsible if the document you are looking for is not available, incomplete, in a different language than yours, or if the model or language do not match the description. Lastmanuals, for instance, does not offer a translation service.
Click on "Download the user manual" at the end of this Contract if you accept its terms, the downloading of the manual GAF TOPCOAT STANDARDS will begin.