If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Lastmanuals provides you a fast and easy access to the user manual GTO PRO-SW 3200XL SLAVE. We hope that this GTO PRO-SW 3200XL SLAVE user guide will be useful to you.
Lastmanuals help download the user guide GTO PRO-SW 3200XL SLAVE.
Manual abstract: user guide GTO PRO-SW 3200XL SLAVE
Detailed instructions for use are in the User's Guide.
[. . . ] for installing the GTO/PRO SW-3200 with the GTO/PRO SW-3000 in a dual application
DC-SERIES
Installation Manual
®
DC-SERIES
®
FOR PROFESSIONAL INSTALLATION ONLY!
This equipment is similar to other gate or door equipment and meets or exceeds Underwriters Laboratory Standard 325 (UL 325). However, gate equipment has hazards associated with its use and therefore by installing this product the installer and user accept full responsibility for following and noting the installation and safety instructions. Failure to follow installation and safety instructions can result in hazards developing due to improper assembly. You agree to properly install this product and that if you fail to do so GTO, Inc. [. . . ] Thread approximately 6" of the power cable into the control box and retighten sealing nut until the power cable locks into place.
15
FUSE SWITCH
GTO, Inc. 3121 Hartsfield Rd Tallahassee, FL 32303
ALARM BAT
www. gtoinc. com
800-543-GATE
BAT+
DUAL ON MODES
1
1234
2 3 4
ON
OFF
SET LIMIT
MODES ON
1
1 2 3 4 5 6 7 ON
2 3 4 5 6 7
OFF
LEARN TRANSMITTER
SWITCH
10'
12' 14'
8' GATE LENGTH
16'
~~ 18VAC
+ NC RLY-COM NO SOLAR RELAY OUT
GRN BLK
RECEIVER
RED
Strain Relief
Lock Nut
Hub
Sealing Nut
Strain Relief
Operator Power Cable
Single Battery Installed Horizontally with terminals on the right.
NOTE: The battery that came with your GTO/PRO® 3000 ,
Dual Batteries Installed Vertically with terminals on bottom.
MUST be placed horizontally battery with the terminals on the RIGHT. If an optional second battery is needed, both batteries must be placed vertically with terminals at the bottom. An optional second battery can be used for solar and/or high traffic applications, if needed. . 20
Connecting Operator Power Cables
MASTER Operator
Step 4
Insert the stripped power cable wires into the appropriate terminals on the MASTER OPERATOR terminal block. The green wire should be inserted into the GRN terminal, the blue wire into BLU, the orange wire into ORG, black wire into BLK, and the red wire into the RED terminal. Tighten the set screws against the end of the wires. A dab of petroleum jelly on each terminal will help prevent corrosion.
Correct Wrong Wrong
SWITCH
GRN
WHT
MASTER INPUTS
J13 J5
BLUE
BRN
ORG
RED
BLK
Power cable from MASTER operator arm
CYCLE CLOSE SAFETY EXIT OPEN SHADOW LOOP CLOSE EDGE OPEN EDGE
COM COM
GRN
J11 J8
MIN
STALL FORCE
Wire
Terminal Block
Wire
Terminal Block
Wire
Terminal Block
SLAVE Operator
Step 5
Review the Installation Overview illustration on page 12 before proceeding. Cut a slot into the driveway to accommodate PVC conduit (not provided). The buried conduit will protect the 40 foot power cable from automobile tires, lawn mower blades, weed eaters, and grazing animals. Pull the 40 foot second operator power cable through the conduit and secure them into the slot in the driveway.
Step 6
Strip approximately 3/16" of insulation from each wire of the 40 foot power cable. Insert the second operator power cable upward through the right strain relief (if necessary, loosen the sealing nut). Thread approximately 4" of wire into the control box. Retighten strain relief (on the black sheath of the power cable) until the power cable locks into place. Insert the stripped wires of the power cable into the appropriate terminals on the SLAVE OPERATOR terminal block. The green wire should be inserted into the GRN terminal, the blue wire into BLU, the orange wire into ORG, black wire into BLK, and the red wire into the RED terminal. Tighten the set screws against the end of the wires.
Power Cable from the SLAVE operator arm
GRN
21
MAX
RECEIVER
J12
BLK
RED
WHT
SLAVE INPUTS
MASTER INPUTS
J6 J21
SWITCH
BLUE
BRN
ORG
RED
BLK
GRN
WHT
BLUE
BRN
ORG
J13 J5
RED
BLK
Powering the System
IMPORTANT:
·
Installation of the Transformer
The transformer is designed and intended for indoor use. If the transformer can be plugged only into an outside electrical outlet, a weatherproof cover or housing (available at local electrical supply stores) must be used. All low voltage wire used with the GTO/PRO® 300/3200® Gate Operator must be 16 gauge dual conductor, multi-stranded, direct burial wire (see page 23 and the Accessory Catalog). from an ac power source, you will need to use from 10 to 30 watts of solar charging power to charge the battery (see Accessory Catalog). Refer to the Solar Panel and Gate Activity chart below.
·
·
OPTIONAL Solar Panel and Gate Activity
Winter Ratings Zone 1 8 11 14 17 20 Zone 2 16 20 28 36 44 Zone 3 26 30 38 46 54
The table and map illustrate the maximum number of gate cycles to expect per day in a particular area when using from 10 to 30 watts of solar charging power. The figures shown are for winter (minimum sunlight) and do not account for the use of any accessory items. [. . . ] radius of detection of vehicles in motion. Automatic Gate Lock Pull-to-Open (FM144) A MUST for added security. Unlocks and locks automatically as gates open and close. Used with GTO/PRO® DC swing gate operating systems for maximum stability and security. [. . . ]
DISCLAIMER TO DOWNLOAD THE USER GUIDE GTO PRO-SW 3200XL SLAVE
Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets... In any way can't Lastmanuals be held responsible if the document you are looking for is not available, incomplete, in a different language than yours, or if the model or language do not match the description. Lastmanuals, for instance, does not offer a translation service.
Click on "Download the user manual" at the end of this Contract if you accept its terms, the downloading of the manual GTO PRO-SW 3200XL SLAVE will begin.