Manual abstract: user guide HAWKE 753 20R5ASSEMBLY
Detailed instructions for use are in the User's Guide.
[. . . ] Note: If the equipment has a threaded entry it may be advisable to screw the entry component into the equipment to prevent twisting of the cable after step D
Safety First
Hawke International is a division of Hubbell Ltd. Registered Office: Mitre House, 160 Aldersgate Street, London EC1A 4DD. A member of the Hubbell Group of Companies
Hawke International UK Office Oxford Street West, Ashton-Under-Lyne, Lancashire OL7 0NA. UK
www. ehawke. com
AI 318 / AI 339 - Issue L / Page 1 of 4 Sales (UK): 0870 606 0105 Sales: +44 (0) 161 830 6698 Technical (UK): 0870 458 9358 Technical: +44 (0) 161 830 6697 Fax: +44 (0) 161 830 6648 E-mail: sales@ehawke. com
6
Compound
6
4 3 2 2 2 1 4
D Unless already screwed into the equipment hold the entry in position with a spanner/wrench to prevent rotation. [. . . ] Pass the brass pot over the spigot and remove any surplus compound from the top of brass pot and the joint face as indicated.
H Replace the entry over the brass pot ensuring that compound does not cover the end of .
I Locate and hand tighten the sub-assembly and onto the entry . Unscrew the sub-assembly and from the entry then remove any surplus compound from the gland components. Again locate and hand tighten the sub-assembly and onto the entry .
IMPORTANT: The conductors must not be moved for a minimum of four hours.
AI 318 / AI 339 - Issue L / Page 2 of 4
6
5
6
2 2 1 1
J Allow the compound to cure. Untighten the sub-assembly and from the entry . Check that the compound has cured.
K Hand tighten the sub-assembly and onto the entry and add half to three quarters of a turn with a spanner/wrench. Tighten the backnut to form a seal around the cable, then tighten a further full turn using a wrench/spanner. Ensure that the middle nut does not rotate when tightening the backnut. Ensure that the deluge seal is pulled down into position, if fitted. Locate the shroud over the cable gland, if applicable.
The following instructions are the approved methods of passing drain wires etc. through the compound barrier and should be followed if permitted by cable installation specifications.
UNINSULATED EARTH OR DRAIN WIRE PREPARATION
1. 0 INSULATING EARTH OR DRAIN WIRES WITH HEAT SHRINK OR COLD SHRINK TUBING 1. 1 Fold back the armour and bend it to right angles from the inner sheath. 1. 2 Remove foils and tape level with the outer sheath, exposing the uninsulated earth or drain wires and insulated conductors. Cut back a further 10mm of inner sheath. 1. 3 Pass 100mm length of heat shrink or cold shrink tubing over the uninsulated earth or drain wire until it comes into contact with the foils, then shrink the tubing evenly down onto the uninsulated earth or drain wire so that no air pockets occur. 1. 4 To insulate the joint between the foils and the tubing a suitable piece of 10mm long shrink tubing or neoprene stretch tubing or a 10mm wide lap of PVC tape may be used. 1. 5 After completing 1. 1 to 1. 4 on each earth or drain wire, lay the armour parallel to the cable, if applicable, then carry out instruction B.
INDIVIDUAL SHIELDING OR SCREEN PREPARATION
2. 0 INSULATING SCREENS WITH HEAT SHRINK OR COLD SHRINK TUBING 2. 1 Fold back the armour and bend to right angles from the inner sheath. 2. 2 Remove a further 15mm of inner sheath (See Fig. 2. 3 Unravel one or two groups of wires from the individual shielding or screen wires, then remove the remainder of the individual shielding or screen wires (See Fig. 2) and twist the wires along their full length. 2. 4 Pass 100mm length of heat shrink or cold shrink tubing over the individual shielding or screen until it comes into contact with the foils, then shrink the tubing evenly down onto the individual shielding or screen so that no air pockets occur. 2. 5 To insulate the joint between the individual shielding or screen wires and the tubing, place one lap of PVC insulating tape over the exposed metallic joint. 2. 6 After completing 2. 1 to 2. 5 on each individual shielding or screen, lay the armour parallel to the cable. Then carry out instruction B.
Armour
Inner Sheath Shielding Screen Wires
One or two groups of shielding screen wires
Fig. [. . . ] A grounding / earth tag has been provided for use as a grounding point when the cable gland is used with plastic enclosures. This must be fitted to the wall of the enclosure using the threads of the gland and the locknut supplied. Note: Grounding must be carried out in accordance with National Electrical Code Article 250 and 505. 25. A correctly sized grounding conductor must be connected from the tag to the nearest internal connection point of the grounding circuit. [. . . ]
DISCLAIMER TO DOWNLOAD THE USER GUIDE HAWKE 753 20R5
Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets... In any way can't Lastmanuals be held responsible if the document you are looking for is not available, incomplete, in a different language than yours, or if the model or language do not match the description. Lastmanuals, for instance, does not offer a translation service.
Click on "Download the user manual" at the end of this Contract if you accept its terms, the downloading of the manual HAWKE 753 20R5 will begin.