Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets... DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!
If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Lastmanuals provides you a fast and easy access to the user manual HAWKE ZPJB 1. We hope that this HAWKE ZPJB 1 user guide will be useful to you.
Lastmanuals help download the user guide HAWKE ZPJB 1.
Detailed instructions for use are in the User's Guide.
[. . . ] Assembly Instructions for: ZPJB 1 Enclosure
IMPORTANT: This document should be read carefully before commencing installation
Zones of Use of Terminal Box CAT II 2G for use in Zone 1. Service Temperature -60°C to +75°C - IP 66 -50°C to +75°C - IP 67 Minimum Installation Temperature: -5°C
Assembly Instructions AI 288 / Issue B - 12/10
Certification Details
Box Type: ZPJB 1 Exe IIC Baseefa09ATEX0108U II 2 GD Exe IIC Gb Extb A21 IIIC Db IP66/67 IECEx BAS09. 0115U
Component Certified Enclosure Only Additional certification required when assembled with other electrical equipment.
Adjustable Terminal Clamp Insulation
120 mm sq.
102 mm sq.
0. 5 ± 0. 5mm Fixed Terminal Clamp
7m
m
See Terminal Wiring Note
Lid
Four 7mm Fixing Holes
70. 7 mm
Body
Connection Solutions
8 mm
(Dimensions in mm)
AI 288 - Issue B / Page 1 of 2 Hawke International is a division of Hubbell Ltd. [. . . ] The breather / drain devices must be installed in their correct orientation in the bottom face gland plate of the enclosure. The operating temperature range of the enclosure is limited to that of the breather / drain device fitted. Unused entries may be fitted with alternative stopping plugs and/or breather drains to those listed in the schedule. The user is responsible for ensuring that the protection concept temperature class and relevant IP rating are maintained. Carefully remove the lid ensuring the gasket is not displaced or damaged.
TO CLOSE THE LID: 1. Check that the gasket is correctly located in the groove in the underside of the lid and undamaged. Ensure that the correct lid is refitted. Locate and tighten all the lid securing screws into the box body. EARTHING: a) Junction Boxes shall be earthed in accordance with the relevant Code of Practice e. g. b) The PJB 1 boxes are supplied fitted with an internal earth terminal. c) The PJB 1 boxes may be supplied fittd with or without an internal earth continuity plate. Note : An optional internal / external earth stud is available. external of the box.
ENCLOSURE INSTALLATION (EI) a) The IP rating of the enclosure must be maintained for the area of use (e. g. [. . . ] -20°C to +65°C
IP 66
Walsall
Breather Drain
BDE
IECEx BAS 06. 0078U / Baseefa06ATEX0285U Operating Temp: Nitrile -20°C to +70°C Silicone -60°C to +160°C
IP 66
Redapt
Breather Drain
-
Sira 99ATEX3050U - Operating Temp. -50°C to +85°C
IP 66
AI 288 - Issue B / Page 2 of 2 [. . . ]
DISCLAIMER TO DOWNLOAD THE USER GUIDE HAWKE ZPJB 1
Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets... In any way can't Lastmanuals be held responsible if the document you are looking for is not available, incomplete, in a different language than yours, or if the model or language do not match the description. Lastmanuals, for instance, does not offer a translation service.
Click on "Download the user manual" at the end of this Contract if you accept its terms, the downloading of the manual HAWKE ZPJB 1 will begin.