Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets... DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!
If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Lastmanuals provides you a fast and easy access to the user manual INTERMATIC 158PG11953-2. We hope that this INTERMATIC 158PG11953-2 user guide will be useful to you.
Lastmanuals help download the user guide INTERMATIC 158PG11953-2.
Manual abstract: user guide INTERMATIC 158PG11953-2
Detailed instructions for use are in the User's Guide.
[. . . ] INSTALLATION INSTRUCTIONS
and
OPERATIONS MANUAL
PanelGuard® PG60 - PG80 - PG100 Series
Electrical Panel Extension Hardwired Surge
INTRODUCTION
The PG60-80-100 Series is designed to be installed in very close proximity to the power bus of an electric distribution panel or electric panelboard. It can be used with most panels or panelboards in distribution today. The PG60-80-100 Series offers peak surge amperage protection levels of 60 kA to 100 kA per mode. It is designed to be easily mounted above or below the panelboard. [. . . ] Use of a dedicated circuit breaker is optional since the SPD has integral overcurrent fusing. The SPD can be connected through feedthru lugs on a panelboard. The SPD can be connected through a breaker or direct tapped for Switchboard installations. Select a position for the connection that results in the shortest lead lengths between the SPD and the power bus. Leads should be kept as short as possible to insure optimum operation. Measure and cut all leads to proper length. Strip the ends of each lead 9/16" for the SPD terminal lugs and to proper length for the breaker used. Connect the wire leads to the lugs on the bus bars of the SPD. Torque the lugs 35 to 50 inch pounds per UL 486 torque tightening requirements. NOTE: For safety, observe proper wire marking conventions; BLACK for HOT, RED for HOT HIGH LEG, WHITE for NEUTRAL, GREEN for GROUND. Route the wire lead bundle through the collar or connecter into the electric panel. Connect the GROUND (green) lead to the ground bus in electric panel. the tral the If used, connect the NEUTRAL (white) to the neutral bus in electric panel. If installing at a main electrical panel, the neuand ground leads could terminate at a common bus bar in panel.
Line to Line: 240v. ; Line to Neutral: 120v. ; Line to Ground: 120v.
Figure 2 120/208 VAC Three Phase Wye
PG60-208-3Y PG80-208-3Y PG100-208-3Y
L1 L2 L3 N G
Line to Line: 208v. ; Line to Neutral: 120v. ; Line to Ground: 120v.
Figure 3
120/240 VAC Three Phase High Leg Delta
PG60-240-3HLD PG80-240-3HLD PG100-240-3HLD
L1 L2 L3 N G
**
Line to Line: 240v. ; Line to Neutral: 120v. ; Line to Ground: 120v. ** High Line to Neutral: 208v. ; High Line to Ground: 208v.
Figure 4 277/480 VAC Three Phase Wye
PG60-480-3Y PG80-480-3Y PG100-480-3Y
L1 L2 L3 N G
Line to Line: 480v. ; Line to Neutral: 277v. ; Line to Ground: 277v.
Figure 5 480 VAC Three Phase Delta
PG60-480-3DLL PG80-480-3DLL PG100-480-3DLL
L1 L2 L3
8. Connect the phase leads to the appropriate breaker in the electric panel. NOTE: For HIGH LEG DELTA, make certain that the high leg is connected to the center bus bar position in the SPD. Connect wires to the alarm relay leads if used. Alarm wires should be routed through a hole in the outer housing that is separate from the power leads. If the alarm relay is not used, leave the wires in the low voltage section, they will have no power and do not need to be capped. Refer to the alarm wiring drawings on page 3 or on the wiring label on the inner housing for wire designation. CHECK all connections for correct torque.
G
Line to Line: 480v. ; Line to Ground: 480v.
INSTALLATION INSTRUCTIONS and OPERATIONS MANUAL
3
PG60-80-100 SERIES - V. 10-03
SUGGESTED WIRE and BREAKER SIZES
Use the following table as a guideline for the PG60, PG80 and PG100 Surge Protection Devices. [. . . ] The ALARM indicator light should be OFF. Periodic functional checks of the system as required by local codes or procedures are conducted by performing steps 9 and 10 of the FINAL CHECKOUT PROCEDURE.
COVER PLATE INSTALLATION
The cover plate has labels on the front and back. One side has the labels positioned for use when the SPD is located at the top of the electrical panel. The second side of the cover plate is used when the SPD is positioned at the bottom of the electric panel. [. . . ]
DISCLAIMER TO DOWNLOAD THE USER GUIDE INTERMATIC 158PG11953-2
Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets... In any way can't Lastmanuals be held responsible if the document you are looking for is not available, incomplete, in a different language than yours, or if the model or language do not match the description. Lastmanuals, for instance, does not offer a translation service.
Click on "Download the user manual" at the end of this Contract if you accept its terms, the downloading of the manual INTERMATIC 158PG11953-2 will begin.