User manual KUSSMAUL 091-32-S

Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets... DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!

If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Lastmanuals provides you a fast and easy access to the user manual KUSSMAUL 091-32-S. We hope that this KUSSMAUL 091-32-S user guide will be useful to you.

Lastmanuals help download the user guide KUSSMAUL 091-32-S.


Mode d'emploi KUSSMAUL 091-32-S
Download
Manual abstract: user guide KUSSMAUL 091-32-S

Detailed instructions for use are in the User's Guide.

[. . . ] BOOK# 091-32-S rev. A, 12-16-2004 INSTRUCTION MANUAL LOAD MANAGER-S A START-UP AND SHUT DOWN LOAD SEQUENCER AND AUTOMATIC LOAD SHEDDING SYSTEM FOR SYSTEMS WHERE RELAY COILS ARE WIRED TO GROUND MODEL #091-32-S 3 YEAR WARRANTY KUSSMAUL ELECTRONICS CO. , INC. 170 CHERRY AVE. , WEST SAYVILLE, N. Y. 11796 TEL: in NY 631-567-0314 TOLL FREE: 800-346-0857 FAX: 631-567-5826 INTRODUCTION The LOAD MANAGER is a device which: 1. [. . . ] At installation, the highest priority load is wired to relay 1 which is operated by terminal 3. (NOTE THAT THE RELAYS ARE NOT PART OF THE "LOAD MANAGER" AND ARE SUPPLIED BY THE INSTALLER) The second highest priority load is wired to relay 2 which is operated by terminal 4. A total of 7 relays, decreasing in priority are operated by terminals 5, 6, 7, 8, & 9. Upon start-up, when the LOAD MANAGER operates as a sequential loading device, the loads are applied in priority order with the highest priority first. When the LOAD MANAGER feature is enabled and excessive electrical loads cause a drop in battery voltage, the LOAD MANAGER will deenergize loads at approximately 60 second intervals starting with the lowest priority. Loads will be removed until the voltage returns to normal. After installation the user may vary the priority by altering the switch setting from the BASIC SETTINGS illustrated in figure 2. CAUTION There are 5 switches, each with 5 levers. Only one lever on each switch may be in the "ON" position. Each switch controls the operation of a relay. The actuation sequence of a particular relay is controlled by the individual levers of each switch. Lever #5 is the lowest priority, while lever #1 is the highest. It is thus possible to arrange the relay operating priority for the 5 lowest priority relays. NOTE The LOAD MANAGER is designed to operate relays. It is not necessary to connect to all outputs. [. . . ] shall have no liability for damages of any kind to associated equipment arising from the installation and /or use of the Kussmaul Electronics Company, Inc. The purchaser, by the acceptance of the equipment, assumes all liability for any damages which may result from its installation, use or misuse, by the purchaser, his or its employees or others. [. . . ]

DISCLAIMER TO DOWNLOAD THE USER GUIDE KUSSMAUL 091-32-S

Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets...
In any way can't Lastmanuals be held responsible if the document you are looking for is not available, incomplete, in a different language than yours, or if the model or language do not match the description. Lastmanuals, for instance, does not offer a translation service.

Click on "Download the user manual" at the end of this Contract if you accept its terms, the downloading of the manual KUSSMAUL 091-32-S will begin.

Search for a user manual

 

Copyright © 2015 - LastManuals - All Rights Reserved.
Designated trademarks and brands are the property of their respective owners.

flag