Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets... DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!
If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Lastmanuals provides you a fast and easy access to the user manual LIFT-MASTER 90 100OP 1. We hope that this LIFT-MASTER 90 100OP 1 user guide will be useful to you.
Lastmanuals help download the user guide LIFT-MASTER 90 100OP 1.
Manual abstract: user guide LIFT-MASTER 90 100OP 1
Detailed instructions for use are in the User's Guide.
[. . . ] (See figure one for additional wiring help).
WARNING
TO AVOID SERIOUS PERSONAL INJURY OR DEATH FROM ELECTROCUTION, DISCONNECT ELECTRIC POWER TO OPERATOR BEFORE INSTALLING 100VA TRANSFORMER.
WARNING
230V 1Ph OPERATORS: 1. Remove the four wires connected to the 40VA transformer in the electrical box and discard. Remove the 40VA transformer from the electrical box and replace with new 100VA transformer. [. . . ] Connect a new black wire from H4 on the transformer to #6 on th closed contactor. Connect a new white wire from H1 on the transformer to L2 on the terminal block. Connect a new brown wire from X2 on the transformer to the interlock switch. Connect a new yellow wire from XF on the transformer to the wire nut. Install fuse #35-204 into fuse clips on transformer. (See figure one for additional wiring help).
FIGURE 1
BK
INTERLOCK SWITCH #L2 TERMINAL BLOCK
BR
X2 -
H1 JUMPER, 115V OPERATORS H3
FUSE
WIRE NUT
YE
XF X1
JUMPER, 230V OPERATORS H2 JUMPER, 115V OPERATORS H4
WH
#6 CLOSED CONTACTOR
NOTES: 1. For 115V 1Ph operators connect a jumper between H1 and H3 and between H2 and H4. For 230V 1Ph operators connect a jumper between H2 and H3. Install fuse (#35-204) in mounting clips on transformer. 2
INSTALLATION INSTRUCTIONS 3PH OPERATORS
8. Install fuse #35-204 into fuse clips on transformer. (See figure one for additional wiring help).
WARNING
TO AVOID SERIOUS PERSONAL INJURY OR DEATH FROM ELECTROCUTION, DISCONNECT ELECTRIC POWER TO OPERATOR BEFORE INSTALLING 100VA TRANSFORMER.
WARNING
460V 3Ph OPERATORS: 1. Remove the four wires connected to the 40VA transformer in the electrical box and discard. Remove the 40VA transformer from the electrical box and replace with new 100VA transformer. Mount the transformer with (4) #8-32 x 1/4" self tapping screws (supplied).
230V 3Ph OPERATORS: 1. Remove the four wires connected to the 40VA transformer in the electrical box and discard. Remove the 40VA transformer from the electrical box and replace with new 100VA transformer. Mount the transformer with (4) #8-32 x 1/4" self tapping screws (supplied). [. . . ] Connect a new brown wire from X2 on the transformer to the overload. Connect a new yellow wire from XF on the transformer to the wire nut. Install fuse #35-204 into fuse clips on transformer. [. . . ]
DISCLAIMER TO DOWNLOAD THE USER GUIDE LIFT-MASTER 90 100OP 1
Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets... In any way can't Lastmanuals be held responsible if the document you are looking for is not available, incomplete, in a different language than yours, or if the model or language do not match the description. Lastmanuals, for instance, does not offer a translation service.
Click on "Download the user manual" at the end of this Contract if you accept its terms, the downloading of the manual LIFT-MASTER 90 100OP 1 will begin.