Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets... DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!
If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Lastmanuals provides you a fast and easy access to the user manual LIFT-MASTER GROUND ROD INSTALLATION. We hope that this LIFT-MASTER GROUND ROD INSTALLATION user guide will be useful to you.
Lastmanuals help download the user guide LIFT-MASTER GROUND ROD INSTALLATION.
Manual abstract: user guide LIFT-MASTER GROUND ROD INSTALLATION
Detailed instructions for use are in the User's Guide.
[. . . ] E A R T H G R O U N D R O D I N S TA L L AT I O N
Proper grounding gives an electrical charge, such as from an electrical static discharge or a near lightning strike, a path from which to dissipate its energy safely into the earth. [. . . ] If you should cut the ground wire too short, break it, or destroy its integrity, replace it with a single wire length.
The earth ground rod must be located within 3 feet from the equipment being grounded.
to equipment to be grounded
12 Gauge Wire
For the correct depth, consult the local code
Warning:
Not responsible for improper installation or failure to comply with all necessary local building codes.
Chamberlain Elite Phone System
1 2 3
(NOT equipped with a5 built-in surge suppressor board) 6 4
7
ERASE EXIT
PROGRAM
8 0
9
ENTER
HELP
Q
SHIFT
W A Z S
E D X
R F C
T G V
Y H B
U J N
I K M
O L
P
SPACE BAR
'
BACK SPACE
15 Pin Input/Output Connector
Black
White 12 Gauge Wire
Chassis Ground
Protected Side
12 VAC
GREEN: CHASSIS GROUND
POWER
WHITE:
12 VAC
BLACK:
Transformer
Unprotected Side
Refer to Earth Ground Rod Installation
OUT
IN
POWER INPUT RS 485 WIRING
It is important that the chassis grounds on the suppressor, RS 485 device and Entry Phone system are properly grounded. (Refer to Earth Ground Rod Installation. )
1 Install surge suppressor module within 5 ft of Phone equipment to be protected. side black and white wire terminals of the surge suppressor IN 2 Connect the module to the power input of the Phone equipment to be protected. (Polarity does not matter) side of the surge suppressor module to the transformer screw 3 Connect the OUT terminals. (Polarity does not matter) Note: Center terminal is not used. 4 Connect the green "Chassis Ground" of the surge suppressor module to the earth ground rod. 5 Connect the chassis ground of the equipment to the earth ground rod. (Refer to earth ground rod installation for details)
Typical RS 485 Device
Transformer
Unprotected Side
POWER
Protected Side
12 VAC
WHITE:
12 VAC
BLACK:
GREEN: CHASSIS GROUND
OUT
IN
12 Gauge Wire
OFF ON
TERMINATE
RS-485 GND (+) () COMM
POWER INPUT
STRIKE RELAY
Chassis Ground
NC RF INPUT COM NO
DISARM RELAY
NC EXIT SWITCH COM NO
D4 DEVICE ID NUMBER GREEN D7 RED D3 YELLOW 100'S 10'S 1'S
Refer to Earth Ground Rod Installation
POWER INPUT SURGE SUPPRESSOR MODULE
(Low Voltage 12 VAC)
This power input surge suppressor module is specifically designed to prevent damage caused by near-lightning strike or electrostatic discharge on a power input port. [. . . ] All Rights Reserved 114A2918 845 Larch Avenue Elmhurst, Illinois 60126
®
TM
www. chamberlain. com [. . . ]
DISCLAIMER TO DOWNLOAD THE USER GUIDE LIFT-MASTER GROUND ROD INSTALLATION
Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets... In any way can't Lastmanuals be held responsible if the document you are looking for is not available, incomplete, in a different language than yours, or if the model or language do not match the description. Lastmanuals, for instance, does not offer a translation service.
Click on "Download the user manual" at the end of this Contract if you accept its terms, the downloading of the manual LIFT-MASTER GROUND ROD INSTALLATION will begin.