User manual LIFT-MASTER HS670-100 B2

Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets... DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!

If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Lastmanuals provides you a fast and easy access to the user manual LIFT-MASTER HS670-100 B2. We hope that this LIFT-MASTER HS670-100 B2 user guide will be useful to you.

Lastmanuals help download the user guide LIFT-MASTER HS670-100 B2.


Mode d'emploi LIFT-MASTER HS670-100 B2
Download
Manual abstract: user guide LIFT-MASTER HS670-100 B2

Detailed instructions for use are in the User's Guide.

[. . . ] Installation Instructions Commercial Vehicular Slide Gate Operator Hydraulic Models: HS670-100-B2 HS670-200-B2 Doc 01-20221 Rev D 2 IMPORTANT! Installers: Leave this manual with the end user after completing the installation. Limited One-Year Warranty LiftMaster gate operators are warranted against deficiencies in material and workmanship for a period of one (1) year from date of purchase, providing recommended installation and maintenance procedures are followed. This warranty is in lieu of all other warranties expressed or implied (some states do not allow limitations on how long an implied warranty lasts, so this limitation may not apply to you) and shall be considered void if damage was caused by fire, flood or lightening. The manufacturer will not be responsible for any labor charges incurred in the removal or replacement of deficient parts. In case of failure due to deficiencies in material or workmanship during the warranty period, the complete gate operator will be repaired or replaced items in warranty. [. . . ] Supply voltage must be within 10% of the operator rating under load conditions. Connect power accordance with local codes. Wire table is based on stranded copper wire. Wire insulation must be suitable to application. 4 5 6 7 8 9 POWER WIRING THREE PHASE MAX. SINGLE UNIT DUAL UNIT WIRE GAUGE 230 1HP 343 171 12 VOLT H. P. SINGLE UNIT DUAL UNIT WIRE GAUGE 115 HP 56 28 12 SINGLE PHASE MAX. (FT. ) Doc 01-20221 Rev D Pre-Installed Check-List 89 44 10 11 546 273 10 868 434 8 143 71 8 1381 690 6 460 1HP 1593 796 12 227 113 6 230 1HP 226 113 12 2533 1266 10 359 113 10 4029 2014 8 572 179 8 6407 3203 6 230 2HP 181 90 12 909 286 6 115 2HP 29 14 12 289 144 10 46 23 10 459 229 8 74 37 8 731 118 59 6 Doc 01-20221 Rev D 12 Pre-Installed Check-List 365 6 460 2HP 796 398 12 230 2HP 110 55 12 1266 633 10 175 87 10 2014 1007 8 280 140 8 3203 1601 6 445 222 6 Table 3 Table 2 CONTROL WIRING VOLTAGE 24 vac MAX DIST. (FT. ) 102 163 Table 4 For longer control wiring distances, LiftMaster "Long distance Interface" (LDI) should be used. WIRE GAUGE 14 12 Doc 01-20221 Rev D Installation 13 Installation Installation Notes Installation show is for a right-handed unit (on right side of gate opening when inside looking out). If there is existing concrete at area of unit mounting, use dimensioning procedure described in step 1. Conduit locations may require modifications to suit your application. Step 1: Concrete Pad Layout concrete pad as detailed. Locate conduit, as required, prior to pouring concrete. Pour concrete, insuring that pad is level and above the ground line. Pad must be a minimum of 24 inches in depth or below the frost line, whichever is greater. Allow concrete to set at least 2 days before installing unit. Locate four (4) ½" threaded anchors (not supplied) or other means of fastening as shown. Anchors must be positioned accurately and be secure in the concrete. See Figure 5. 1 2 3 4 5 NOTES Always use separate conduits for power wiring and control wiring. You may want to install extra conduit for future wiring considerations. For detailed information on the emergency disconnect system, see instructions supplied with it. This in only a suggested layout, other pad layouts are possible. Doc 01-20221 Rev D 14 Installation "GATE" SHOWN OPEN AS REQ'D. [. . . ] 3 4 5 6 7 Press the "close" button. Allow unit to run until the open limit switch shuts the system down. Press the "open" button. Allow unit to run until the open limit switch shuts the system down. Press the "close" button and test all safety features that have been installed. Check out all optional controls that have been installed. [. . . ]

DISCLAIMER TO DOWNLOAD THE USER GUIDE LIFT-MASTER HS670-100 B2

Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets...
In any way can't Lastmanuals be held responsible if the document you are looking for is not available, incomplete, in a different language than yours, or if the model or language do not match the description. Lastmanuals, for instance, does not offer a translation service.

Click on "Download the user manual" at the end of this Contract if you accept its terms, the downloading of the manual LIFT-MASTER HS670-100 B2 will begin.

Search for a user manual

 

Copyright © 2015 - LastManuals - All Rights Reserved.
Designated trademarks and brands are the property of their respective owners.

flag