Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets... DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!
If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Lastmanuals provides you a fast and easy access to the user manual LIFT-MASTER SW425. We hope that this LIFT-MASTER SW425 user guide will be useful to you.
Lastmanuals help download the user guide LIFT-MASTER SW425.
Detailed instructions for use are in the User's Guide.
[. . . ] OWNER'S MANUAL MODEL SW425
RESIDENTIAL SWING GATE OPERATOR
2 YEAR WARRANTY
Serial # ________________________ (located on electrical box cover) Installation Date __________________ MODEL SW425 IS FOR USE ON VEHICULAR PASSAGE GATES ONLY AND IS NOT INTENDED FOR USE ON PEDESTRIAN PASSAGE GATES
TABLE OF CONTENTS
OPERATOR SPECIFICATIONS
Carton Inventory . . 2 Operator Dimensions and Specifications . . 4-5
WARNING
Mechanical
OPERATOR WARNINGS
UL325 Model Classifications . . 7 Suggested Entrapment Protection Device Locations . [. . . ] If the gate operator is a standard 115V model, run conduit from the 115V power source into the gate operator (Figure 1). The gate operator is provided with a 90 degree flexible conduit fitting for installations where the electrical box is relatively close. Because of the 90 degree fitting, it is generally easier to run the electrical wires through the flexible conduit before attaching the conduit. Wiring for other devices such as push buttons may also be run at this time either in the same conduit or in another.
Figure 1
Conduit Holes
Junction Box
Flexible Conduit Conduit Fitting
Make sure that wiring is employed as required by local codes. Figure 2 If not already done, run three 12 gauge wires (hot, neutral and ground) from the power source, through the conduit and into the gate operator (Figure 2). It is easier to run these wires back out of the large hole in the operator along with the three existing wires. This allows the connection to be made externally and then later inserted back into the operator through the large hole. Be sure to use wire nuts to secure these connection. Be sure that the grounding wire is connected to a good earth ground. Make the connections as follows: · Black to (hot) · White to (neutral) · Green to (ground)
Line Neutral Ground Wire Nut
13
WIRING
BATTERY RUN INSTALLATION
If the gate operator is a battery run model, it is packaged from the factory with the battery disconnected. Connect the red wire to the positive battery terminal and the black wire to the negative battery terminal (Figure 3). There are wires provided for connecting the low voltage burial cable from the transformer to the gate operator. Be sure that the positive and negative match the positive and negative of the charger. Connect the other end of the burial cable from the operator to the transformer. Be sure to match the positive and negative terminals of the charger to the positive and negative terminals of the battery (Figure 4). Once the connections are made, plug the charger into a 115V outlet. If possible, it is desirable to locate the charger out of the weather. Be sure the battery has been properly charged before putting into operation. Figure 3
Negative Terminal Batteries
SOLAR POWERED INSTALLATION
If the gate operator is solar powered, no power will need to be run into the machine. The ends of the wires are provided with connectors which can simply be plugged in (Figure 5). Turn the panel so that it will get maximum sunlight during the day. If necessary the panel may be mounted away from the gate operator to get it out of the shade and into more consistent sunlight. [. . . ] Primary and Secondary Arm Kit Complete with: Primary arms, swivel, hex bolts, locknut, hex nuts, flatwashers, lockwashers, pipes, coupling and disconnect arm. Radio Kit Complete with: Radio, antenna, cable extension kit, screws, flatwashers, lockwashers and nuts. ITEM 1 2 3 4 5 6 7 8 9 10 11 12
INDIVIDUAL PARTS PART # 13-40067 10-40137 20-40155 21-40074 23-40161 25-40083 25-40152 29-40071 29-40089 29-40095 29-NP712 K79-40056 K79-40098 DESCRIPTION Limit Nut Gate Bracket Motor, 12Vdc Transformer Limit Switch, SPDT Overload, 1. 5 amp Motor Breaker, 7 amp Resistor, 1 Ohm, 25W, Ohmite Sonalert Piezo Alarm Charger, Battery 12V . 5A Dual Stg Battery, 12V 7AH Control Board - Full System Control Board - Solar
K2 K74-40084
K3 K74-40045
K4 K74-40065
K5 K72-40146
K6 K74-40141
K7 K74-40031
K8 K74-40151
K9 K75-40132
K10 K74-19916
26
I L L U S T R AT E D PA R T S
K9
2
K5 K8
5 8
4 K1 3 K10 K2 K4
12 K3 K6
10
K7 6 9
11
27
WARRANTY POLICY
LIFTMASTER® TWO YEAR LIMITED WARRANTY
The Chamberlain Group, Inc. warrants to the first retail purchaser of this product, for the structure in which this product is originally installed, that it is free from defect in materials and/or workmanship for a period of two years from the date of purchase. [. . . ]
DISCLAIMER TO DOWNLOAD THE USER GUIDE LIFT-MASTER SW425
Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets... In any way can't Lastmanuals be held responsible if the document you are looking for is not available, incomplete, in a different language than yours, or if the model or language do not match the description. Lastmanuals, for instance, does not offer a translation service.
Click on "Download the user manual" at the end of this Contract if you accept its terms, the downloading of the manual LIFT-MASTER SW425 will begin.