User manual OMRON ZG2

Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets... DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!

If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Lastmanuals provides you a fast and easy access to the user manual OMRON ZG2. We hope that this OMRON ZG2 user guide will be useful to you.

Lastmanuals help download the user guide OMRON ZG2.


Mode d'emploi OMRON ZG2
Download

You may also download the following manuals related to this product:

   OMRON ZG2 DATASHEET (739 ko)

Manual abstract: user guide OMRON ZG2

Detailed instructions for use are in the User's Guide.

[. . . ] Z288-E1-01 ZG2 Series Smart Sensor 2D Profile Measuring Sensors USERS MANUAL Introduction Thank you for purchasing the ZG2 series. This manual provides information regarding functions, performance and operating methods that are required for using the ZG2. When using the ZG2, be sure to observe the following: · The ZG2 must be operated by personnel knowledgeable in electrical engineering. · To ensure correct use, please read this manual thoroughly to deepen your understanding of the product. [. . . ] value Output Sampling period BOTTM The "minimum value" in the sampling period is held. The output measurement value is held at the same value for one sampling period, that is, until the next sampling period ends. value Output Sampling period P-P The "difference between the max. value" in the sampling period is held. The output measurement value is held at the same value for one sampling period, that is, until the next sampling period ends. value) Sampling period 112 Adjusting the Output Conditions of the Measurement Result ZG2 User's Manual Setting value AVERAGE Description The "average of the measurement values" in the sampling period is held. The output measurement value is held at the same value for one sampling period, that is, until the next sampling period ends. Current measurement value Sampling period Output (average value) SAMPLE The measurement value instantaneously obtained at the start of the sampling period is held. The output measurement value is held at the same value between two sampling periods, that is, until the next sampling period starts. Current measurement value Sampling period Output ZG2 User's Manual Adjusting the Output Conditions of the Measurement Result 113 3 FUNCTION SETTINGS Setting Zero Reset Setting the Offset Value To set a reference value for zero reset to a value other than 0 (zero), set the offset amount using this function. After setting any target value, execute a zero reset in the RUN mode. Executing Reference Zero Reset p. 115 ADJ mode-MENU/VIEW key-[OUT]-[ZERO] Setting value ZERO Description Sets the offset amount. Range: -999. 99999 to +999. 99999 (default value: 0) Note To change numerical values, use the key/ key, and to change the number of digits use the key/ key. 114 Setting Zero Reset ZG2 User's Manual Executing Reference Zero Reset When the zero reset function is used, the reference value "0" is registered as the height, and the measured value can be displayed and output as a positive or negative deviation (tolerance) from the reference value. In the RUN mode, the measured value can be reset to "0" at any time during measurement. 1 2 Switch to the RUN mode. Set the object to be used as the reference in place. 3 (reference value) FUNCTION SETTINGS Zero Reset indicator 3 Press the SET key. The Zero Reset indicator lights, and the current measured value is registered as 0 (zero). Note · To cancel a zero reset, press and hold the ESC key for 2 seconds or longer. · Zero reset can also be executed and canceled by an external input. · A value other than zero also can be set as the zero reset reference value. Setting the Offset Value p. 114 ZG2 User's Manual Setting Zero Reset 115 Bank Settings The ZG2 can hold up to 16 sets of settings, which are called a "bank". Bank 1 is displayed as the default bank when the Smart Sensor is turned ON. Banks 2 to 16 are also provided in addition to this. Tasks and Bank Data p. 53 Bank Switching (change of device setup) The currently selected bank can be switched to other banks. Switching of banks is instructed by operating Controller keys, external signals or communication commands. FUN mode-[BANK]-[SWITCH] Setting value BANK1 to BANK16 Description Selects the target bank. [. . . ] For the file for the firmware update and Warp Engine Zero, please contact your OMRON representative. Important · During a firmware update, do not turn the Controller OFF. Doing so will prevent the Controller from functioning normally. · When installing Smart Monitor and the USB driver, log in as an administrator or a user having the same privileges as a computer administrator for changing system settings. Connecting the Controller to the PC 1 Connect the Controller to the PC with a USB cable. When connecting the Controller to a PC for the first time, the USB driver must be installed in advance. 2 Turn the Controller ON. Important Make sure that the Controller's power supply is connected securely. [. . . ]

DISCLAIMER TO DOWNLOAD THE USER GUIDE OMRON ZG2

Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets...
In any way can't Lastmanuals be held responsible if the document you are looking for is not available, incomplete, in a different language than yours, or if the model or language do not match the description. Lastmanuals, for instance, does not offer a translation service.

Click on "Download the user manual" at the end of this Contract if you accept its terms, the downloading of the manual OMRON ZG2 will begin.

Search for a user manual

 

Copyright © 2015 - LastManuals - All Rights Reserved.
Designated trademarks and brands are the property of their respective owners.

flag