Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets... DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!
If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Lastmanuals provides you a fast and easy access to the user manual SAECO SG200E. We hope that this SAECO SG200E user guide will be useful to you.
Lastmanuals help download the user guide SAECO SG200E.
Detailed instructions for use are in the User's Guide.
[. . . ] Hot beverage vending Machine
Saeco Group 200
Model: ESPRESSO
TYPE: SG200E
i
WARNING: This instruction manual is intended exclusively for specialized personnel. www. espressoitalia. com. au
Espresso Italia PTY LTD Freecall 1300 660 976
OPERATION AND MAINTENANCE
English
MAIN PARTS
11
5
10
13
12
7 3 2 1 6 4
8
1 2 3 4 5 6 7 8 9 10 11 12 13
9
Brew group and coffee grinder Brewing hopper group Sugar and stirrer dispensing group CPU card Cup dispenser Payment system area POWER card Water circuit equipped with air-break device Pump Tray socket Data plate Data plate showing the minimum and maximum water pressure Water mains connection
2
Espresso Italia PTY LTD www. espressoitalia. com. au Freecall 1300 660 976
English 77. 1 7. 2
TABLE OF CONTENTS
PAYMENT SYSTEM INSTALLATION . . . . . . . . . . . . . . . . . . . . 24
Payment system installation on the machine . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . [. . . ] The responsibility for possible damages to the machine and other objects and for personal injuries caused by an incorrect installation of the payment system falls on the person who installed the system. - remove the cup dispenser - from the internal side of the door, cut the external film following the punched shape which corresponds to the desired cashless payment or coin validation system (fig. 36)
fig. 37 - after finishing the whole perimeter, install and secure the payment system - connect the payment system to the CPU card - reassemble the cup dispenser NOTE: a special interface card is required for connecting 12 Vcd coins validation systems to the CPU card. - Then enter programming so as to choose convenient settings. See section 8 PROGRAMMING AND MAINTENANCE MENU in order to check parameter setting, which should be in line with the system used.
fig. 36 - cut away plastic door joints by means of an hacksaw (fig. 37)
24
Espresso Italia PTY LTD www. espressoitalia. com. au Freecall 1300 660 976
English 7. 2 Payment system installation on the base cabinet - connect the coiner to the CPU card NOTE: Executive, MDB and BDV serial systems are connected to the CPU card using a cable and an interface in necessary, both included in the special kit. - Then enter the programming menu so as to choose convenient settings. See section 8 PROGRAMMING AND MAINTENANCE MENU in order to check parameter setting, which should be in line with the system used.
The base cabinet has no payment system. The responsibility for possible damages to the machine and other objects and for personal injuries caused by an incorrect installation of the payment system falls on the person who installed the system. - remove or turn the coiner supporting plate (fig. 38, ref. 1) - hook and secure the coiner to the support (fig. 38, ref. 2) - reassemble and lock the support to the cabinet door (fig. 38, ref. 3) fig. 38, rif. 1
fig. 38, rif. 2
fig. 38, rif. 3
fig. 38
Espresso Italia PTY LTD 25 www. espressoitalia. com. au Freecall 1300 660 976
English
8- PROGRAMMING AND MAINTENANCE MENU
Important This chapter illustrates how to set up or modify the machine programming and maintenance parameters. It should therefore be read carefully, to fully understand the correct sequence of operations to be performed. 39 shows the standard position of keys on the door keypad; to which all the following sections will refer to.
Key ò:DOWN
Key ñ: UP
Key c: CANCEL / beverage 01
Key e: ENTER / beverage 05
beverage 02
beverage 06
beverage 03
beverage 07
beverage 04 fig. 39
beverage 08
26
Espresso Italia PTY LTD www. espressoitalia. com. au Freecall 1300 660 976
English 8. 1 Description of programming and maintenance phase keys 8. 2. 1 Entering the programming menu
To surf inside the menu of the vending machine use the keys described below. 39) By pressing this key it is possible to access the following level of programming or maintenance. Furthermore it is possible to modify or confirm the values set in the entries of the programming or maintenance menus. 39) By pressing this key it is possible to go back to the previous level of the programming or maintenance menu. It is also possible to avoid storing the values of the previously required modification. 39) By pressing this key it is possible to access the preceding entry inside the same menu level. If used after requesting to modify a datum, it decreases its value of this same datum. 39) By pressing this key it is possible to access the following entry inside the same menu level. If used after requesting to modify a datum, it increases the value of this same datum. 8. 2 Programming menu The structure of the programming menu is shown in 8. 2. 2. 8. 2. 3 describes all the entries in the programming menu.
Open the door, insert the key into the safety switch (fig. 18) and press key P1, located on the CPU card (fig. 40, ref. 1) so as to enter the programming menu.
1 2 3
fig. 40 If no password has been assigned you enter the programming menu directly. [. . . ] If this is not the case, stop and then restart the machine to allow the automatic positioning of the cup bracket. Remove the device by unhooking the elastic hook of the ring (fig. 60) Check the satellite scrolls and, if need be, rinse the device so as to remove dirt.
fig. 61 In case of disassembly of all the internal parts of release ring assembly, refer to the specific assembling instructions (fig. 62) fig. 60
52
Espresso Italia PTY LTD www. espressoitalia. com. au Freecall 1300 660 976
English
ALIGN THE FIVE SCROLLS REFERENCES
ALIGN THE TWO ARROWS
fig. 62
Espresso Italia PTY LTD 53 www. espressoitalia. com. au Freecall 1300 660 976
English 9. 5 Resin regeneration (where the water softener is provided) - remove the cover and introduce 1. 5 kg salt - refit the cover - turn the machine on and drain the water until it is no longer salty Resin regeneration is to be carried out according to the water of the system to which the dispenser is connected. Use the table below as a reference: WATER HARDNESS °French 10 20 30 40 50 SELECTION NUMBER 60cc 25000 12500 9500 6500 5000 130cc 12500 6000 4500 3000 2500 - power the machine off and close the tap. [. . . ]
DISCLAIMER TO DOWNLOAD THE USER GUIDE SAECO SG200E
Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets... In any way can't Lastmanuals be held responsible if the document you are looking for is not available, incomplete, in a different language than yours, or if the model or language do not match the description. Lastmanuals, for instance, does not offer a translation service.
Click on "Download the user manual" at the end of this Contract if you accept its terms, the downloading of the manual SAECO SG200E will begin.