User manual SAUNIER DUVAL ECOSY SB 24 E 07-99

Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets... DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!

If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Lastmanuals provides you a fast and easy access to the user manual SAUNIER DUVAL ECOSY SB 24 E. We hope that this SAUNIER DUVAL ECOSY SB 24 E user guide will be useful to you.

Lastmanuals help download the user guide SAUNIER DUVAL ECOSY SB 24 E.


Mode d'emploi SAUNIER DUVAL ECOSY SB 24 E
Download
Manual abstract: user guide SAUNIER DUVAL ECOSY SB 24 E07-99

Detailed instructions for use are in the User's Guide.

[. . . ] Heating and hot water for the professionals ECOSY ECOSY 24 E, ECOSY 5B 24 E is CAT II2H3+ appliances ECOSY 28 E, ECOSY 5B 28 E is CAT I2H appliances IN WARRANTY TECHNICAL HELPLINE 01773 828400 01773 828100 1 INSTALLATION AND OPERATING INSTRUCTIONS ECOSY 24 E, ECOSY SB 24 E ECOSY 28 E, ECOSY SB 28 E Note!The boiler serial number is marked on the label attached to the top of the inner bulkhead. Refer to the 'Introduction' section page 3 for a description of the basic functions of the boiler. The 'Users' section describes how to safely operate the boiler. USERS SECTION Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . [. . . ] 600 G C E F M N A B D I H L 12 Ven 060b Ins 033AT BOILER INSTALLATION Statutory requirements The installation of this boiler must be carried out by a competent person in accordance with the relevant requirements of the current issue of: The Gas Safety (Installation and Use) Regulations The Building Regulations The local water company Byelaws The Building Standards Regulations (Scotland) The Health and Safety at Work Act Sheet metal parts WARNING. When installing or servicing this boiler, care should be taken when handling the edges of sheet metal parts to avoid the possibility of personal injury. Installing the boiler Prior to starting work, the system must be thoroughly flushed so as to eliminate any foreign bodies and contaminants such as filings, solder particles, oil, grease etc. Solvent products could cause damage to the system. q Engage boiler upper part onto the hanging bracket. q Allow the boiler to seat down onto support plate. q Fit filter and washers, strictly adhering to the sequential order and directions shown on diag. Connect the various couplings between boiler and connection plate. q Fit water trap supplied (diagram 11) to the condense outlet located underneath and to the left rear of the boiler. The outlet of the trap must then be connected to the household drainage system via a suitable water trap, such as a washing machine type trap. q BEFORE STARTING THE BOILER, THE TRAP MUST BE FILLED WITH WATER. Diagram 11 Hose to be connected to a drain 20 1, 5 227 120 227 12 0 80 Ø 20 1, 5 Diagram 12 Hab 212a 13 Ins 030 Ø 80 FLUE INSTALLATION The boiler is only suitable for top outlet flue connection. A - Flue to rear of boiler q Mark correct position of hole from template. B - Flue to side of boiler q Mark the horizontal centre line for the hole on the rear wall. Extend the horizontal centre line to the side wall and mark the vertical centre line of flue hole as shown in diagram 13. Under normal circumstances, it will be possible to gain access to the outside of the building to fit the flue terminal assembly. Where outside access is not possible e. g. high rise buildings, the flue terminal can be fitted from inside the building only if required. Important : When cutting the flue hole and when extending the flue centre line to a side wall, remember that the flue system must have a fall of about 35 mm per metre of flue DOWNWARD TOWARDS the boiler. There must NEVER be a downward incline towards the terminal. Cutting the flue hole q Making allowance for the slope of the flue, cut hole in external wall, preferably using a core drill. For installations with internal and external access Use a 105 mm diameter core drill. For installations with internal access only - Use a 125 mm diameter core drill. Important : Before cutting the hole for flues to the rear of boiler, always cover fixing jig to make sure it is not damaged. [. . . ] Alternatively, connect a CO2 analyser to the combustion test point on the flue elbow. q Press the «Mode» and «+» buttons simultaneously, the letter H is displayed and the boiler is now running at high gas flow rate. q Allow the boiler to run for a few minutes to stabilise and check the CO2 value, refer to table 4. q At the 28E and SB28E the CO2 at high gas flow rate is automatically controlled. [. . . ]

DISCLAIMER TO DOWNLOAD THE USER GUIDE SAUNIER DUVAL ECOSY SB 24 E

Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets...
In any way can't Lastmanuals be held responsible if the document you are looking for is not available, incomplete, in a different language than yours, or if the model or language do not match the description. Lastmanuals, for instance, does not offer a translation service.

Click on "Download the user manual" at the end of this Contract if you accept its terms, the downloading of the manual SAUNIER DUVAL ECOSY SB 24 E will begin.

Search for a user manual

 

Copyright © 2015 - LastManuals - All Rights Reserved.
Designated trademarks and brands are the property of their respective owners.

flag