If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Lastmanuals provides you a fast and easy access to the user manual SAUNIER DUVAL XEON 18 HE. We hope that this SAUNIER DUVAL XEON 18 HE user guide will be useful to you.
Lastmanuals help download the user guide SAUNIER DUVAL XEON 18 HE.
Manual abstract: user guide SAUNIER DUVAL XEON 18 HE
Detailed instructions for use are in the User's Guide.
[. . . ] High Efficiency Condensing Boiler
Instructions for use Installation and servicing
Xeon 18 HE Xeon 30 HE G. C. 41-920-46
Guarantee Registration
Thank you for installing a new Saunier Duval appliance in your home. Saunier Duval appliances are manufactured to the very highest standard so we are pleased to offer our customers a Comprehensive Guarantee. This product is guaranteed for 24 months from the date of installation or 30 months from the date of manufacture, whichever is the shorter, for parts. [. . . ] Isolation should preferably be by a double pole switched fused spur box having a minimum contact separation of 3mm on each pole. The fused spur box should be readily accessible and preferably adjacent to the boiler. A fused three pin plug and shuttered socket outlet may be used instead of a fused spur box provided that: a) They are not used in a room containing a fixed bath or shower. b) Both the plug and socket comply with the current issue of BS1363. The mains electrical supply must be maintained at all times in order to provide domestic hot water.
To gain access to the connection box remove the two retaining screws indicated in Diagram 9. 1 and carefully lower and pull forward the box to reveal the terminal strip inside. Remove the test cable from the terminal strip and discard. Connect both the mains supply and switched live from the external controls (room thermostat and, if applicable, frost thermostat) into the marked terminals as shown in diagrams 9. 2 and 9. 3. If a room thermostat is not fitted, then the connecting link must be fitted between terminals 1 and 2, see diagram 12. 2. Connect the pump supply into the marked pump terminals as shown in diagram 9. 2. Observe all terminal markings and colour codes as shown in diagram 12. 2. NOTE: The boiler incorporates a pump overrun thermostat. Only feed the pump from the marked terminals in the connection box on the boiler, not from a separate supply. Ensure that all flexible cords are routed through the strain relief cable glands on the inlet of the connection box. Refit the connection box to the underside of the boiler using the two retaining screws.
RETAINING SCREWS (2)
9. 1 External controls (Mains Voltage)
Important: If a replacement supply cable is required it must be purchased. Ensure that a separate external controls cable and pump supply cable are fed to the boiler. All HE boilers are fitted with a connection box located at the base of the boiler into which all connections are made. CONNECTION BOX
Diagram 9. 1
30
11831
Do not interrupt the mains supply with a time switch or programmer.
9. 2 Electrical connections - testing
Carry out preliminary electrical system checks as below: 1. Test insulation resistance to earth of mains cable. Test the earth continuity and short circuit of cables. Test the polarity of the mains.
9. 3 Pump Connection
Ensure that a separate pump supply cable is fed to the boiler, see diagram 9. 2. Route the pump supply cable through the strain relief cable gland, connect to the connection box as shown in diagram 9. 2. Refer to diagram 12. 2 for wiring colour code. [. . . ] Remove electrical leads.
13. 20 Mains Reset Slider
Refer to section 13. 18 for access. Remove slider by springing back retaining clip and pushing out from the back.
13. 21 User Interface
Refer to section 13. 18 for access and diagram 13. 10. When replacing the board refer to instructions supplied with replacement PCB on setting it up.
Installation and servicing instructions strictly reserved
13. 17 Inner Casing Sealing Panel
Refer to section 11. 7. 12614 ELECTRICAL CONNECTIONS SWITCH SWITCH COVER
13. 18 Access to Switches, User Interface and 230v controls Interface
For access, refer to section 13. 1. [. . . ]
DISCLAIMER TO DOWNLOAD THE USER GUIDE SAUNIER DUVAL XEON 18 HE
Lastmanuals offers a socially driven service of sharing, storing and searching manuals related to use of hardware and software : user guide, owner's manual, quick start guide, technical datasheets... In any way can't Lastmanuals be held responsible if the document you are looking for is not available, incomplete, in a different language than yours, or if the model or language do not match the description. Lastmanuals, for instance, does not offer a translation service.
Click on "Download the user manual" at the end of this Contract if you accept its terms, the downloading of the manual SAUNIER DUVAL XEON 18 HE will begin.